Resurfacing on S.R. 96 from the Williamson County line to near Veterans Parkway - Rutherford County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN263081
6.09), a 6.090-mile stretch in Rutherford County. The project must be completed by August 31, 2027. Bids are due via the internet through Bid Express by 10:00 A.M. Central on December 4, 2026. Contractors must also be in good standing with the Tennessee Secretary of State. A 5% bid bond is required, submitted electronically. Bid authorization is available until 4:00 P.M. Central the day before the letting.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- internet
- Documents analyzed
- 2
- Required submission items
- 3 items · full checklist with Pro
Steps to Bid
- 1
Obtain bid authorization via the Bid Express website by 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM
- 2
Download the Proposal Contract, Plans, and Specifications from the TDOT Construction Division website.
- 3
Submit a bid via the internet through Bid Express by 10:00 A.M. Central on December 4, 2026. by Dec 4, 2026, 10:00 AM
What you'll need
Contract duration
On or before 8/31/2027
Submission
Internet
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN263081, Call No. 047 - Rutherford County Project No. NH/HSIP-96(79), 75S096-F8-009 (PIN 136298.00), 75S096-F3-011 (PIN 136298.00): The resurfacing on S.R. 96 from the Williamson County line (L.M. 6.09). Project Length - 6.090 miles. Completion Time - On or before 8/31/2027 (See Special Provision 108B). Internet bidding mandatory.
Key dates
- Questions due
- Dec 3, 2026, 4:00 PM Central Time
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
More from this agency
- Grading, Drainage, and Paving to Construct a J-Turn on S.R. 60 in Cleveland, Bradley County, Tennessee · closes Dec 4, 2026
- Resurfacing on S.R. 227 from the Alabama State Line to May Branch Loop, Wayne County, Tennessee · closes Dec 4, 2026
- Resurfacing on S.R. 52 from the Sumner County line to near Old Highway 52 - Macon County · closes Dec 4, 2026
- Resurfacing on I-40 from the Madison County line to near MM 100.4, including bridge expansion joint repair and thin… · closes Dec 4, 2026
- Resurfacing on I-40 from near MM 9.31 to near Macon Road, Shelby County, TN · closes Dec 4, 2026
Similar bids in Tennessee
- Perry County High School Modular Building Customizations, together with all related work as specified and shown · closes Dec 10, 2026
- Upgrade Critical Environments I · closes Dec 21, 2026
- Pole Barn Construction — Invitation to Bid · closes Dec 3, 2026
- WWII Hangar Renovation – Bid Schedules A, B, and C · closes Dec 11, 2026
- Student Center Building Envelope and Interior Renovations · closes Dec 16, 2026
Closing soon in Tennessee
- Security Consulting Services · closes Dec 1, 2026
- SCCF Domestic Water Piping Phase 2, South Central Correctional Facility, Clifton, Wayne County, Tennessee · closes Dec 2, 2026
- Custodial Services · closes Dec 3, 2026
- Concrete and Brick Sands · closes Dec 3, 2026
- Resurfacing on I-81 from Jefferson County Line to Near Exit 12, Hamblen County · closes Dec 4, 2026