OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Resurfacing on U.S. 11W (S.R. 1) from near S.R. 70 to near AFG Road, Hawkins County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN261087

11W (S.R. 1) in Hawkins County, from near S.R. 70 to near AFG Road, totaling 12.6 miles. Work includes resurfacing in two segments: 5.5 miles from near S.R. 70 to near S.R. 346, and 7.1 miles from near S.R. 346 to near AFG Road. The project must be completed by October 31, 2027. Bids are due via the internet through Bid Express by 10:00 A.M. Contractors must be in good standing with the Tennessee Secretary of State. A 5% bid bond is required, submitted electronically. Bid authorization must be obtained by 4:00 P.M. Central the day before the letting.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Submission
internet
Documents analyzed
2
Required submission items
3 items · full checklist with Pro

Steps to Bid

  1. 1

    Download the Proposal Contract, Plans, Specifications, and Special Provisions from the TDOT Construction Division website. by Before bid submission

  2. 2

    Ensure the contractor is in good standing with the Tennessee Secretary of State.

  3. 3

    Submit the electronic bid bond (5% of the bid amount) via Bid Express. by Same as bid submission

What you'll need

Contract duration

On or before 10/31/2027

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN261087, Call No. 022: Resurfacing on U.S. 11W (S.R. 1) from near S.R. 70 (L.M. 18.00) to near S.R. 346 (L.M. 23.50), 5.500 miles; and from near S.R. 346 (L.M. 23.50) to near AFG Road (L.M. 30.60), 7.100 miles. Total contract length: 12.600 miles. Completion time: On or before 10/31/2027 (See Special Provision 108B). The Standard Specifications for Road and Bridge Construction, dated April 1, 2026, are incorporated by reference.

Key dates

Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee