OpenConstructionCloses Dec 4, 2026, 10:00 AM CT

Resurfacing on S.R. 33 from near Clarks Grove Road to the Knox County Line - Blount County

Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN261032

16.08) to the Knox County line (L.M. 20.66), a 4.580-mile stretch in Blount County. Bids are due via the internet (Bid Express) by 10:00 A.M. Central on December 4, 2026. Internet bidding is mandatory. Contractors must be in good standing with the Tennessee Secretary of State. Bidding authorization is available until 4:00 P.M. Central the day before the letting. A 5% bid bond is required and must be submitted electronically. The project must be completed by July 31, 2027. A list of subcontractor quotes must be submitted electronically within five calendar days after bid submission.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 10:00 AM CT
Time stated in bid documents
Dec 4, 2026, 10:00 AM Central Time
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
internet
Documents analyzed
2
Required submission items
4 items · full checklist with Pro

Steps to Bid

  1. 1

    Request bidding authorization via the online form on the TDOT Construction Division website. Authorization is available until 4:00 P.M. Central the day before the letting. by Dec 3, 2026, 4:00 PM

  2. 2

    Download the bid documents, including the Proposal Contract, Standard Specifications, and Plans, from the TDOT Construction Division website.

  3. 3

    Review all addenda posted on the Bid Express website until 2:00 P.M. Central the day before the letting. by Dec 3, 2026, 2:00 PM

  4. 4

    Submit the bid electronically via Bid Express by 10:00 A.M. Central on December 4, 2026. by Dec 4, 2026, 10:00 AM

  5. 5

    Submit the electronic bid bond (5% of the bid amount) via Bid Express by the same deadline. by Dec 4, 2026, 10:00 AM

What you'll need

Contract duration

On or before 7/31/2027

Submission

Internet

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 4-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Contract No. CN261032, Call No. 003 - Blount County Project No. STP/HSIP-33(165), 05S033-F8-004 (PIN 134058.00), 05S033-F3-004 (PIN 134058.00): The resurfacing on S.R. 33 from near Clarks Grove Road (L.M. 16.08) to the Knox County line (L.M. 20.66). Project Length - 4.580 miles. Completion Time - On or before 7/31/2027 (See Special Provision 108B).

Key dates

Bids due
Dec 4, 2026, 10:00 AM CT

Documents

  • 20261204_NoticeToContractors.pdf14 pages
  • 20261204_InstructionsToBidders.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in Tennessee

Closing soon in Tennessee