Bridge Resurfacing with FDR and HMA Overlay on SH 14 at Weld/Logan County Cl-East
Colorado DOT — Region 4Logan, Colorado#STA 0142-052 (17217)
Colorado Department of Transportation (CDOT) is soliciting bids for bridge resurfacing with Full Depth Reclamation (FDR) and Hot Mix Asphalt (HMA) overlay on State Highway 14 at the Weld/Logan County Cl-East location in Logan County, Region 4. The work includes full-depth reclamation of existing pavement, placement of HMA overlay, and associated traffic control and safety measures. The project is delivered via Design-Bid-Build. The project is managed by Joel McCracken at (970) 520-7005. The budget range is $10M–$20M.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 10, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 3
Steps to Bid
- 1
Register with CDOT's eProcurement portal (Official linkPro) and obtain a vendor ID.
- 2
Review the full bid package, including plans, specifications, and addenda, available at Official linkPro
- 3
Submit questions to Joel McCracken at (970) 520-7005 or via email (if provided) by December 3, 2026. by Dec 3, 2026, 11:59 PM
- 4
Submit the completed bid package by December 10, 2026, at 11:59 PM Mountain Time. by Dec 10, 2026, 11:59 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237131, 237132
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Delivery method is Design-Bid-Build. Budget range is $10,000,000 to $20,000,000. The project is scheduled to be advertised on November 19, 2026, with the letting date set for December 10, 2026.
Key dates
- Bids due
- Dec 11, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf4 pages
- CDOTPlanHolders.pdf16 pages
More from this agency
- Culvert Repair - SH 115 at MP 6.93, Fremont County · closes Dec 11, 2026
- Removal of Structurally Deficient HOV Gantry on US 85 Between Milepost 203.8 and 211 · closes Dec 11, 2026
- Resurfacing and ADA Ramps Improvement on Alameda Avenue - Decatur to Lipan, Denver County · closes Dec 11, 2026
- Install a Roundabout at the Intersection of CO 83 and Stagecoach Road, El Paso County · closes Dec 11, 2026
- Roadway widening and other improvements on US 24 from MP 317.8 – 321.3 — El Paso County · closes Dec 11, 2026
Similar bids in Colorado
- 2026/2027 Rio Blanco County CR17 Bridge Replacement Project Invitation for Bid
- Mill/Overlay, ADA Updates, Bridge Work on WB US6 to WB I70 - Jefferson County, CO · closes Dec 4, 2026
- Prefabricated Fiber-Reinforced Polymer (FRP) Trail Bridge for Elkhorn Trail · closes Dec 7, 2026
- Resurfacing, Rumble Strips, and Bridge Deck Repairs on SH 135 from MP 14.1 to MP 23.8, Gunnison County, Colorado · Gunnison · closes Dec 11, 2026
- Bridge Rehabilitation on US 50 from MP 132 to MP 136.5, Gunnison County, Colorado · Gunnison · closes Dec 4, 2026
Closing soon in Colorado
- CCCS RFP 27-006 Executive Coaching · closes Nov 30, 2026
- Hydrological Database (HDB) Support Services IDIQ · closes Dec 1, 2026
- Realignment on West Side of Wellington Downtown - CO 1 (8.2 MM - 9.3 MM) · closes Dec 4, 2026
- CPW On-Call Water Resource Engineering Services · closes Dec 4, 2026
- Archives Collection Management Database · closes Dec 4, 2026