Two (2) 20 MVA, 115 to 13.2Y/7.62 kV Power Transformers with Load Tap Changer for ECU Substation and Dickinson Ave Substation
Greenville Utilities CommissionGreenville, North Carolina#26-74
The transformers must be new, fully operable, and include all specified components, including a 5-year warranty, SEL 2414 monitoring system, Vaisala DGA monitor, Reinhausen LTC, and Beckwith tap-changer control. Bidders must submit a completed Proposal Form, signed by an authorized official, on the enclosed form. A bid bond of 5% of the total bid amount is required. Bids must be submitted in sealed envelopes, addressed to the Procurement Manager, and delivered to 401 S. Greene Street, Greenville, NC 27834, by 2:00 PM (ET) on January 5, 2027. Late bids will not be accepted.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 5, 2027
- Time stated in bid documents
- Jan 5, 2027, 2:00 PM Eastern Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Documents analyzed
- 2 published · 1 analyzed
Scope of work
- Procure two (2) 20 MVA, 115 kV to 13.2Y/7.62 kV power transformers with load tap changers.
- Include all materials, components, and accessories as specified in the bid documents.
- Provide unloading, handling, rigging, and placement of each transformer at its respective substation site.
- Ensure compliance with ANSI, IEEE, NEMA, and NESC standards.
- Provide SEL 2414 electronic temperature monitoring system.
Steps to Bid
- 1
Review the full bid documents, including specifications, terms and conditions, and the enclosed Proposal Form.
- 2
Submit all questions to Cleve Haddock, Procurement Manager, by end of business day, December 10, 2026. by Dec 10, 2026, 5:00 PM
- 3
Obtain and review the complete bid package from the Office of the Procurement Manager, 401 S. Greene Street, Greenville, NC, during regular business hours (8:30 AM – 5:00 PM, Monday–Friday).
- 4
Prepare and complete the enclosed Proposal Form, including all required information such as manufacturer, catalog number, delivery time, and pricing.
- 5
Seal the completed Proposal Form and bid bond in a single envelope, clearly marked with the bid title and opening date and time.
- 6
Deliver the sealed envelope to the Office of the Procurement Manager, 401 S. Greene Street, Greenville, NC 27834, by 2:00 PM (ET) on January 5, 2027. by Jan 5, 2027, 2:00 PM
What you'll need
Contract duration
24 months or less from award
Submission
Mail, Hand delivery
NAICS
335912, 335913
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Purchase of two (2) three-phase, 20 MVA, 115 kV delta primary, 13.2Y/7.62 kV secondary, oil-filled, load tap changer-equipped autotransformers for installation at ECU Substation and Dickinson Ave Substation. The transformers shall be designed and constructed to meet or exceed ANSI, IEEE, NEMA, and NESC standards. Key specifications include: 55/65°C construction, 8.00% impedance at 75°C, 5-year warranty, SEL 2414 electronic temperature monitoring system, Vaisala Optimus DGA monitor, Reinhausen MR Type RMV-II-2000 LTC, Beckwith M-2001D digital tap-changer control, and full compliance with NEMA TR-1 sound level standards. The bid must include catalog numbers, manufacturer, ratings, performance data, and evidence of short-circuit testing.
Key dates
- Questions due
- Dec 10, 2026, 5:00 PM Eastern Time
- Bids due
- Jan 5, 2027
Documents
- 26-74-rfb-for-two-2-power-transformers-for-ecu-substation-and-dickinson-ave-.pdf51 pages
- 26-74-q-a.pdf1 pages
More from this agency
Similar bids near Greenville
- SUBSTATION #3 TRANSFORMER RE-GASKETING · Rocky Mount · closes Dec 1, 2026
Closing soon near Greenville
- Residential Rehabilitation and Urgent Repair Services for 3 ESFRLP Homes and 4 URP Homes · Kinston · closes Nov 30, 2026
- Whitakers Proposed Community Center – Request for Qualifications (RFQ) for Architect-Engineer Services · Whitakers · closes Nov 30, 2026
- Request for Bids for Septic System Installation — Wayne County 2021 CDBG-NR Project · Wayne County · closes Dec 1, 2026
- Request for Qualifications for On-Call Professional Engineering Services · Ayden · closes Dec 4, 2026