OpenIFBCloses Dec 1, 2026

SUBSTATION #3 TRANSFORMER RE-GASKETING

City of Rocky MountRocky Mount, North Carolina#320-320-231026FD

The City of Rocky Mount seeks qualified transformer service contractors to perform leak repairs and re-gasketing on a substation transformer. The contractor must provide all labor, oil, supervision, equipment, tools, and materials. Required submittals include three references, experience statement, insurance proof, safety program, and completed bid form. The bid must include a base lump sum price, optional testing pricing, estimated duration, required outage, start date, and warranty. The City may reject any bid or cancel the solicitation.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 1, 2026
Time stated in bid documents
Dec 1, 2026, 3:00 PM Eastern Time
Bid bond
10%
Submission
email, mail, hand delivery
Documents analyzed
3 published · 2 analyzed

Scope of work

  • Removal and processing of transformer oil
  • Vacuum hold and oil filling using hot-oil processing equipment
  • DGA and fluid-quality analysis of transformer oil
  • Provision of written test reports and documentation

Steps to Bid

  1. 1

    Submit written questions by November 23, 2026, at 2:00 PM ET via email to [email available with Pro] with subject line 'IFB #320-231026FD: Questions'. was Nov 23, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  2. 2

    Prepare and submit the bid by December 1, 2026, at 3:00 PM ET. by Dec 1, 2026, 3:00 PM

What you'll need

Submission

Email, Mail, Hand delivery

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The contractor shall provide all necessary labor, oil, supervision, equipment, tools, and materials required to safely complete the work and return the transformer to service. The scope includes mobilization of qualified personnel and equipment, coordination with City personnel, removal and processing of transformer oil, replacement of leaking radiator gaskets and sealing materials, inspection for damage, a minimum 12-hour vacuum hold using a vacuum system and hot-oil processing equipment, oil filtering and processing, vacuum-filling with processed oil, verification of oil level and leak inspection, post-work oil sampling, DGA and fluid-quality analysis, and provision of written test reports and documentation. The contractor must also provide a statement of experience, three references for similar work within the last five years, proof of required insurance, and safety program information. The City reserves the right to reject any or all bids, waive minor informalities, and cancel the IFB.

Key dates

Questions due
Nov 23, 2026, 2:00 PM Eastern Time
Pre-bid meeting
Dec 1, 2026, 10:00 AM Eastern Time
Bids due
Dec 1, 2026

Documents

  • IFB_320231026FD_Substation_3_Transformer_ReGasketing.pdf15 pages
  • IFB_320051126TW_Utility_ROW_Mowing_Bush_Hog_and_Side_Cutting.pdf19 pages
  • IFB_320231026FD_Substation_3_Transformer_Regasketing_Addendum_1_1_.pdf

See all documents · Download with Pro

More from this agency

Similar bids near Rocky Mount