RFP - Professional Engineering Design Services: High School Road Multimodal Connector & South Park Loop Road, Jackson, Wyoming
Teton CountyJackson, Teton, Wyoming#TETONCO-217553
Teton County, Wyoming, is seeking qualified civil engineering, transportation planning, and landscape architecture firms to provide professional design services for the High School Road Multimodal Connector and South Park Loop Road. The scope includes advancing corridor design (Segments 1–6) to 30% design by spring 2027 and delivering construction drawings for Segment 4 (High School Road between South Park Loop Road and Middle School Road) by late summer 2027. The work supports federal grant applications and includes public engagement. The RFP is open to qualified firms with demonstrated expertise in transportation and multimodal infrastructure. Responses must be submitted via the PublicPurchase portal.
On PublicBidSearch: the original bid posting and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 18, 2026, 1:00 PM Mountain Time
- Submission
- online portal
Steps to Bid
- 1
Review the RFP and all attachments on the PublicPurchase portal
- 2
Submit a proposal via the PublicPurchase portal by the due date and time by Dec 18, 2026, 1:00 PM
What you'll need
Submission
Online portal
How to submit
Submit proposal via the PublicPurchase portal at Official linkPro
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
Cancel anytime · no card to browse
Project details
Teton County, Wyoming, through its Public Works Department, is issuing a Request for Proposals (RFP) to solicit design proposals from qualified professional civil engineering, transportation planning, and landscape architecture firms. High School Road (HSR) is a critical multimodal connector identified in the Town of Jackson and Teton County Community Streets Plan, linking residential neighborhoods, elementary, middle, and high schools, Central Wyoming College (CWC), sports fields, commercial centers, and regional pathways in West Jackson. A segment of South Park Loop Road from Boyles Hill Road to Jackson Hole Classical Academy is experiencing increased traffic and population growth. The Board of County Commissioners has approved a Development Plan for Area 1 of Northern South Park, and staff are prioritizing improvements to the HSR segment adjacent to Area 1. Building on completed conceptual engineering (approximate 10% design provided as an attachment), Teton County seeks a consultant team to advance the corridor design (Segments 1 through 6) to 30% design by spring 2027 to support federal grant applications (e.g., BUILD, SS4A), conduct public engagement, and deliver construction drawings for Segment 4 (High School Road between South Park Loop Road and Middle School Road) by late summer 2027. The corridor is divided into five functional segments, each addressing distinct traffic operations, multimodal access, and access management needs.
Key dates
- Bids due
- Dec 18, 2026
More from this agency
- 2027–2029 Teton County Fair Graphic Design & Marketing Services — closes Nov 25, 2026
- 2027–2029 Teton County Fair Concert Production Services — closes Nov 25, 2026
- Community Recreation Center Custodial Services — closes Nov 30, 2026
- RFP - RV Park Management Services — closes Dec 3, 2026
- Jackson Hole Fire/EMS Mobile Water Supply Apparatus — closes Dec 4, 2026
Similar open bids
- Requests for Fee Schedule Proposals – General Licensed Trades, Construction and Engineering Services — City of Lander
- Design Services for HVAC System at Glenrock Junior and Senior High School — WY School Facilities Division
- Design Services for Upton High School Boiler System — WY School Facilities Division
- Design Services for Glenrock IS Electrical System — WY School Facilities Division
- AML Project 87, Phase I – Hanna Roadway Infrastructure Repair - Department of Environmental Quality — Wyoming State Construction Department
Closing this week nearby
- SCSD2 Transportation Bus Barn Electrical Equipment Replacement Project — closes Nov 19, 2026
- Cody Regional Office Janitorial Services — closes Nov 19, 2026
- UV Disinfection System Replacement at Alpine Wastewater Treatment Facility — closes Nov 19, 2026
- Request for Proposals: WWTP UV Disinfection System Replacement — closes Nov 19, 2026