Roof Replacement for Pray-Sims Hall, University of Wisconsin - Stevens Point
University of Wisconsin - Stevens PointStevens Point, Portage, Wisconsin#26C3M
The scope includes removal of existing built-up roofing down to the concrete deck, installation of R-30 insulation, a 60-mil EPDM single-ply membrane, perimeter guard rails, and pre-finished flashings. A non-mandatory pre-bid tour is scheduled for December 16, 2026, at 10:30 AM. The contract is estimated at $416,000. The project is managed by Specialty Engineering Group LLC.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Jan 7, 2027, 6:00 AM CT
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- eBuilder Bidding Portal, U.S. Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
- Contract term
- 120 calendar days from Notice to Proceed
- Documents analyzed
- 2
- Required submission items
- 4 items · full checklist with Pro
Scope of work
- Remove and dispose of existing gravel-surfaced built-up roofing down to concrete deck
- Submit bid via eBuilder portal or physical delivery
Steps to Bid
- 1
Obtain bidding documents
Download construction documents (drawings, specifications, addenda) in PDF format from the DFD public website: [link available with Pro]. Documents are also available at Builders’ Exchanges.
- 2
Attend pre-bid tour (optional) by Dec 16, 2026, 10:30 AM
A non-mandatory pre-bid tour is scheduled for December 16, 2026, at 10:30 AM at 501 Reserve Street, Stevens Point, WI 54481. Contact Jarred Enerson at (715) 340-5793 or [email available with Pro] for details.
- 3
Confirm bid submission
After accessing the bid portal link, confirm company and contact details and click save. No deposit is required to access documents.
What you'll need
Submission
EBuilder Bidding Portal, U.S. Mail, Third-party delivery (UPS, FedEx, DHL), Hand delivery
NAICS
236220, 236221
How to submit
Submit a single PDF file containing all required bid documents, including the bid form and bid bond, with original wet signatures or properly transmitted electronic signatures. Only PDF files are accepted. The bid must be sealed and delivered before 1:00 PM CDT on January 7, 2027. Third-party delivery is at the bidder’s risk. The eBuilder portal is the preferred method of submission.
In person/mail: State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
- The 4-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Installation of a self-adhered vapor barrier, R-30 average insulation system, and fully adhered 60-mil EPDM single-ply membrane. Provision of a perimeter free-standing guard rail system and pre-finished sheet metal flashings. Work to be performed at 501 Reserve Street, Stevens Point, WI 54481. Bid submission via eBuilder Bidding Portal (preferred), U.S. Bid opening via Microsoft Teams at 2:00 PM CDT. as of September 23, 2017. DFD Project No. 26C3M. A/E: Specialty Engineering Group LLC (0000008910).
Key dates
- Pre-bid meeting
- Dec 16, 2026, 10:30 AM Central Time
- Bids due
- Jan 7, 2027, 6:00 AM CT
Documents
- 26C3M_A-1_Document.pdf2 pages
- 26C3M_TOC.pdf2 pages
Closing soon near Stevens Point
- Sealed Bids for 14 Tracts of Sawtimber and Pulpwood — Langlade County, WI · Antigo · closes Dec 2, 2026
- Installation of Fish Sticks Habitat Structures for Lincoln County Waterways · Merrill · closes Dec 2, 2026
- Install Centralized Water Softener at FCI Oxford, Wisconsin · Grand Marsh · closes Dec 4, 2026
- Apple Device Buyback and New Device Provisioning for D.C. Everest Area School District · Weston · closes Dec 4, 2026