OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Russell County - Microsurface on SR-169 from SR-1 (US-431) to SR-8 (US-80)

Alabama Department of Transportation — ALDOTAlabama#STPAA-FMGR-0169(504)

This is a forecast for a construction project in Russell County, Alabama, involving microsurfacing on SR-169 from SR-1 (US-431) to SR-8 (US-80). The contract time is 55 working days. Further details are available in the ALDOT Letting List Detail Report 023 as of August 4, 2026.

On PublicBidSearch: the original bid posting and 2 bid documents for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Bid bond
Bond required
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Length: 9.93 miles
  • Work Type: Preventative Maintenance Level 1
  • Includes micro-milling, resurfacing, and traffic stripe

Steps to Bid

What you'll need

Bid security

Required

Bond required

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

F/A Project Number: STPAA-FMGR-0169(504). ALDOT Project Number: 100081159. Length: 9.93 mi. Tentative Letting Date: December 04, 2026. This project is part of ALDOT's tentative letting date of December 4, 2026, but is subject to change. No Notice to Contractors has been published yet. The project involves micro-milling, resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and traffic stripe on SR-169 from the junction of SR-1 (US-431) to the junction of SR-8 (US-80). Length: 9.927 mi.

Key dates

Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • FutureLettings.pdf66 pages
  • PITEMS032.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar bids in Alabama

Closing soon in Alabama