OpenConstructionCloses Dec 8, 2026

Section/Corridor Improvement - SC 48 (Assembly Street) MP 0 - MP 2.5 - Phase 2 - Multi-Use Path - Richland County

South Carolina Department of Transportation — SCDOTSouth Carolina#8875960

Construction of a 0.983-mile multi-use path on SC 48 (Assembly Street) in Richland County, SC. Scope includes removal of existing pavement and curb, excavation, graded aggregate base, asphalt paving, storm drainage (culverts, catch basins, drop inlets, junction boxes), concrete sidewalks, curbs and gutters, pedestrian ramps, detectable warning materials, fencing, and erosion control. Work also includes traffic control, pavement markings, permanent signs, and right-of-way markers. The completion date is August 15, 2027. The contractor must attend a mandatory pre-bid conference on November 5, 2026, at 10:00 AM at SCDOT Headquarters, Columbia, SC. The bid bond is 5% of the approximate bid amount, submitted electronically via BidX.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 8, 2026
Time stated in bid documents
Dec 8, 2026, 2:00 PM Eastern Time
Bid bond
5%
Submission
electronic portal
Documents analyzed
2

Scope of work

  • Remove existing pavement and curb over 358 SY and 1,815 LF respectively
  • Excavate 2,075 CY of unclassified material and 100 CY of borrow
  • Install 4,718 SY of graded aggregate base course (4-inch uniform)
  • Pave with asphalt base course (Type A) 248 TON, intermediate course (Type B) 50 TON, and surface course (Type B) 403 TON
  • Construct 1,997 LF of concrete curb and gutter (2'-0'' vertical face)
  • Install 4,235 SY of concrete sidewalk (4-inch uniform)

Steps to Bid

  1. 1

    Register on the SCDOT Construction Extranet and access the proposal, plans, and bid documents.

  2. 2

    Attend the mandatory pre-bid conference on November 5, 2026, at 10:00 AM at SCDOT Headquarters, 955 Park Street, Columbia, SC. Failure to attend will result in disqualification. was Nov 5, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Electronic portal

NAICS

237130, 237199, 237990

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of a multi-use path along SC 48 (Assembly Street) from MP 0 to MP 2.5, Phase 2, in Richland County, South Carolina. The project includes permanent and temporary cover, compost, selective watering, mowing, and turf reinforcement. The contract is for approximately 0.983 miles. The solicitation is part of the SCDOT December 8, 2026 letting. The proposal form, plans, and bid documents are available on the SCDOT Construction Extranet. Failure to attend will disqualify the bidder.

Key dates

Questions due
Nov 24, 2026, 2:00 PM Eastern Time
Pre-bid meeting
Nov 5, 2026, 10:00 AM Eastern Time
Bids due
Dec 8, 2026

Documents

  • 12-2026.pdf1 pages
  • 12082026_Notice_To_Contractors.pdf31 pages

See all documents · Download with Pro

More from this agency

Similar bids in South Carolina

Closing soon in South Carolina