Server Hardware & Storage Grant RFP
Crowder CollegeNeosho, Missouri
The project includes one primary HPE DL345 Gen12 server with 192GB DDR5 memory, dual 1000W power supplies, and full networking and storage configuration. A second identical server is optional. The storage system consists of a QNAP TS-h2490 with 7 Samsung PM9D3a NVMe SSDs and 2 additional drives. The network includes three 32-port 25G switches, with 16 25G DAC cables. The third switch is a cold spare. Vendors must submit a signed, sealed proposal by 1:00 PM CDT on November 13, 2026, via email or mail. Electronic submissions must be in PDF or Microsoft Word format. Preference is given to Missouri-based vendors and U.S.-manufactured products when comparable. Bidders must comply with Missouri procurement law and the Freedom of Information Act.
On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Nov 14, 2026
- Submission
- email, mail
- Documents analyzed
- 2
Scope of work
- Procure one HPE DL345 Gen12 server with AMD EPYC 9175F CPU
- Install 12x 16GB DDR5 memory (192GB total)
- Include two 480GB SATA mixed-use drives
- Add dual 25Gb and 1Gb network adapters
Steps to Bid
- 1
Review the RFP and Q&A documents thoroughly.
- 2
Submit questions by email to [email available with Pro] by 11/10/2026. was Nov 10, 2026, 1:00 PM
This date has passed — confirm eligibility with the agency before bidding.
- 3
Prepare and submit a signed, sealed proposal by 1:00 PM CDT on 11/13/2026.
- 4
Ensure the proposal includes all required attachments, specifications, and pricing.
- 5
Submit via email to [email available with Pro] or mail to Crowder College, Attn: Finance/ Purchasing, 601 Laclede Ave., Neosho, MO 64850.
What you'll need
Submission
Email, Mail
NAICS
334110
How to submit
Submit one signed original proposal. Electronic submissions must be in PDF or Microsoft Word format. Include all attachments, product specifications, and pricing. The bid number must appear on the front of the envelope or in the email subject line.
In person/mail: 601 Laclede Ave., Neosho, MO 64850
Get alerts for bids like this
New IT and technology bids in Missouri
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The scope includes one primary HPE DL345 Gen12 server with AMD EPYC 9175F CPU, 12x 16GB DDR5 memory (192GB total), dual 1000W power supplies, HPE iLO Advanced 3-year license, and HPE 5-year technical care. The system includes two 480GB SATA mixed-use drives, dual Broadcom BCM57504 25Gb 4-port SFP28 and BCM5719 1Gb 4-port BASE-T OCP3 adapters, HPE MR416i-o Gen11 SPDM storage controller, and HPE C13–C14 power cords. The storage solution includes one QNAP TS-h2490 with 256GB TS-H2490FU-7302P-256G-US, 7 Samsung PM9D3a 1.5TB NVMe SSDs (MZWL615THBLF-00AW7), and 2 additional Samsung PM9D3a drives. The network infrastructure includes three 32-port 25G Ubiquiti USW-PRO-XG-AGGREGATION switches, with 16 25G direct-attach cables (UACC-DAC-SFP28-3M). Electronic submissions are accepted via email to [email available with Pro].
Documents
- 26-27.017-Server-Hardware-and-Storage-Grant-project.pdf4 pages
- RFP-26.27.017-QAs.pdf2 pages
More from this agency
- Maddox Hill Artificial Playground Surface Installation — closes Nov 20, 2026
Similar open bids
- Adrian School District R 3: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing Equipment — Adrian School District R 3
- Adair Co School District R 1: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Adair Co School District R 1
- Adair Co School District R 2: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Adair Co School District R 2
- Clark County School District R1: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Clark County School Dist R 1
- Blackwater School District R 2: E-Rate FY2027 Category 2 - Managed Internal Broadband Services (MIBS) for Existing… — Blackwater School District R 2
Closing this week nearby
- Alton R-Iv School District: E-Rate FY2027 Category 2 - Switches and Necessary Software and Licenses; Switches — closes Nov 18, 2026
- Supplemental Workforce for STIP Projects — Construction and Materials Division, District CO — closes Nov 18, 2026
- Guard Wheel Power Truck Shade Window Right Side (Core Return) — OEM Only, Per Bi-State Specifications — closes Nov 19, 2026
- ISD Santa Fe Trails Elementary School Roof Improvements — closes Nov 19, 2026
- New Ballas Sidewalk Project – Phase 3 — closes Nov 19, 2026