OpenConstructionCloses Dec 17, 2026

Statewide Turnpike Central Paving, I-293, I-93 - Project 45395

New Hampshire DOT — NHDOTNew Hampshire#45395

The New Hampshire Department of Transportation (NHDOT) is soliciting bids for resurfacing and preservation of roadway sections on the Central Turnpike, including F.E. Everett Turnpike (US 3) in Nashua and Merrimack, I-293 in Manchester, and I-93 in Bow and Concord. The scope includes asphalt paving, crack sealing, cold milling, tack coat, joint adhesive, rumble strips, pavement marking (retroreflective paint, preformed tape, polyurea), catch basin reconstruction, and traffic control. Bidders must be prequalified and submit questions at least five business days before the bid opening.

On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 17, 2026
Time stated in bid documents
Dec 17, 2026, 2:00 PM Eastern Time
Submission
electronic portal
Documents analyzed
3

Scope of work

  • Resurface 13,236 tons of HBP-1/2” surface mix (machine method, high strength, QC/QA Tier 1)
  • Resurface 613 tons of HBP-3/8” surface mix (machine method, high strength)
  • Cold plan 310,537 SY of bituminous surfaces
  • Apply 320,147 LF of retroreflective paint pavement marking (6” line)
  • Apply 10,309 LF of preformed retroreflective tape (Type I, removable, 6” line)
  • Apply 13,200 LF of surface-applied retroreflective polyurea pavement marking (12” line)

Steps to Bid

  1. 1

    Register and prequalify with NHDOT by submitting a Request for Proposal (RFP) form to the Contract Office at least 10 days before the bid opening.

  2. 2

    Obtain the RFP form and submit it to the Contract Office for approval.

  3. 3

    Once approved, obtain the password card to access online bidding documents, including plans and specifications.

  4. 4

    Submit all questions in writing to Sam Newsom at [email available with Pro] at least five business days before the bid opening. by Dec 12, 2026, 2:00 PM

What you'll need

Prequalification

Required

Contract duration

10/29/2027

Submission

Electronic portal

NAICS

237130, 237199

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work is divided into zones: 27801 (Bow-Concord I-93), 27808 (Nashua FEET NB), 27809 (Nashua FEET SB), 27803 (Manchester I-293 NB), 27804 (Manchester I-293 SB), 27805 (Manchester I-293 Exit 4), 27806 (Nashua Crackseal), 27807 (Merrimack Crackseal), 27802 (Bow Crackseal). Estimated total quantity of cold planing bituminous surfaces is 310,537 SY. Estimated total quantity of retroreflective paint pavement marking (6” line) is 320,147 LF. Estimated total quantity of rumble strips (16” wide) is 44,627 LF. Estimated total quantity of crack treatment (polymer crumb rubber modified) is 102,065 LB. Estimated total quantity of material transfer vehicle (MTV) is 25,876 TON. Estimated total quantity of asphalt emulsion for tack coat is 5,834 GAL. Estimated total quantity of asphaltic plug for crack control (F) is 414 LF. Estimated total quantity of repair asphaltic plug expansion joint (F) is 654 LF. Estimated total quantity of polyethylene liner is 143 EA. Estimated total quantity of reconstructing/adjusting catch basin & drop inlet is 143 LF. Estimated total quantity of traffic signal detector loop (6 ft x 50 ft) is 3 EA. Estimated total quantity of retroreflective thermoplastic pavement marking (18” line) is 92 LF. Estimated total quantity of retroreflective thermoplastic pavement marking (symbol or word) is 275 SF. Estimated total quantity of temporary erosion and sediment control is $2,000.00. Estimated total quantity of miscellaneous temporary traffic control is $175,000.00. Estimated total quantity of field office (Type B) is 10 MON. Estimated total quantity of mobilization is 1 U. Estimated total quantity of maintenance of traffic is 1 U. Estimated total quantity of portable changeable message sign is 4 U. Estimated total quantity of automated trailer-mounted speed limit sign is 2 U. Estimated total quantity of truck-mounted impact attenuator (test level 3) is 2 U. Estimated total quantity of single large delineator with post is 185 EA. Estimated total quantity of double large delineator with post is 10 EA. Estimated total quantity of sawed bituminous pavement is 750 LF. Estimated total quantity of alterations and additions as needed (unanticipated work) is $25,000.00. Estimated total quantity of temporary pedestrian accommodations is $2,000.00.

Key dates

Bids due
Dec 17, 2026

Documents

  • current-ad-schedule.pdf18 pages
  • statewide-turnpike-central-paving-45395_0.pdf2 pages
  • 45395.pdf7 pages

See all documents · Download with Pro

More from this agency

Similar bids in New Hampshire

Closing soon in New Hampshire