Surface Treatment (1 In. Leveling Course with 1.5 In. Overlay) on CO 12 (MP 26.1–70.4), Las Animas County
Colorado DOT — Region 2Las Animas, Colorado#STR 012A-057 (27299)
Colorado DOT is soliciting bids for a surface treatment on CO 12 from MP 26.1 to 70.4 in Las Animas County. The scope includes milling, a 1-inch leveling course, and a 1.5-inch overlay of hot mix asphalt. The project is delivered via Design-Bid-Build. The bid due date is December 17, 2026, at 11:59 PM MT. The project is managed by Laurel Jones at (719) 251-3499. The budget exceeds $20 million.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name and phone) for this bid.
Contact
Agency contact for this bidName and phone — included with ProProOverview
- Due
- Dec 18, 2026
- Time stated in bid documents
- Dec 17, 2026, 11:59 PM Mountain Time
- Submission
- mail, hand delivery
- Contract term
- 3 years + Two additional one-year renewal terms
- Documents analyzed
- 3
Scope of work
- Apply 1-inch leveling course of HMA
- Reinstall pavement markings and signage
Steps to Bid
- 1
Submit questions to Patrick Vigil at (719) 251-6978 by December 3, 2026. by Dec 3, 2026, 11:59 PM
- 2
Submit the completed bid package by December 17, 2026, at 11:59 PM MT. by Dec 17, 2026, 11:59 PM
What you'll need
Submission
Mail, Hand delivery
NAICS
237133, 237134
How to submit
Submit one original and one electronic copy on a USB drive, sealed in a single envelope. The envelope must be marked 'BID FOR STR 012A-057 (27299) - CO 12 MP 26.1-70.4'.
In person/mail: Colorado Department of Transportation, Region 2, 1000 S. 10th Street, Pueblo, CO 81003
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Surface treatment consisting of a 1-inch leveling course and a 1.5-inch overlay on Colorado State Highway 12 from milepost 26.1 to 70.4, Las Animas County, Region 2. Work includes milling, base preparation, placement of hot mix asphalt (HMA), compaction, and pavement marking. The resident engineer is Laurel Jones, contactable at (719) 251-3499. The project is scheduled to be advertised on November 19, 2026, with the letting date set for December 17, 2026. The budget range is greater than $20,000,000.
Key dates
- Questions due
- Dec 3, 2026, 11:59 PM Mountain Time
- Bids due
- Dec 18, 2026
Documents
- CY_2026_Anticipated_Project_Advertisements.pdf6 pages
- GO_Sheet.pdf4 pages
- CDOTPlanHolders.pdf16 pages
More from this agency
- Resurfacing US 285 Poncha Springs North, Chaffee County, Colorado · closes Dec 4, 2026
- Bridge Rehabilitation on US 50 from MP 132 to MP 136.5, Gunnison County, Colorado · closes Dec 4, 2026
- Hot mix asphalt roadway resurfacing on SH 22 from MP 0 to MP 2.5 — Adams County · closes Dec 18, 2026
- Mill and Overlay SH8 from Old Kipling (MP 7.11) to Wadsworth (MP 8.65) · closes Dec 18, 2026
- Safety & Multimodal Improvements - Medians, Crossings, Bike/Ped - Sheridan SH95 17th to 26th · closes Dec 18, 2026