OpenIFBCloses Dec 15, 2026

SWM Third CNG Compressor Installation Specification Bid Submittal Package Plans

City of Tacoma — Public WorksTacoma, Washington#ES26-0164F

The project includes full engineering, procurement, fabrication, installation, testing, and commissioning of a 3,600 psi, 1,200 scfm CNG compressor system. The contract term is 12 months with two 6-month renewal options. The City reserves the right to reject all bids.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 15, 2026
Time stated in bid documents
Dec 15, 2026, 11:00 AM Pacific Time
Submission
mail, hand delivery
Contract term
12 months from the Notice to Proceed + Two additional 6-month renewal terms
Documents analyzed
1

Scope of work

  • Install third CNG compressor at SWM facility
  • Integrated controls and safety systems

Steps to Bid

  1. 1

    Obtain printed or digital copies of the bid documents from ARC Tacoma at 632 Broadway, Tacoma, WA 98402, or via the online portal.

What you'll need

Submission

Mail, Hand delivery

NAICS

238290, 333610

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The system must be designed to operate at 3,600 psi, with a minimum capacity of 1,200 standard cubic feet per minute (scfm), and include integrated controls, safety systems, and monitoring equipment. The work site is located at 3628 S 35th St, Tacoma, WA 98409. Electronic submission is not accepted.

Key dates

Bids due
Dec 15, 2026

Documents

  • ARCTacomaInformation.pdf1 pages

See all documents · Download with Pro

More from this agency

Similar bids near Tacoma

Closing soon near Tacoma