ClosedRFQ

T32-D6-Drainage A1 Bartow Gordon-194613

Department of TransportationBartow, Gordon, Georgia#48400-eRFQ-002145-2027

The work includes pipe lining at 13 locations on SR 3 and SR 53. The Contractor must begin work within 30 days of the Prework Meeting and complete it within 150 days. The bid must be submitted electronically via GA@WORK Marketplace. The Contractor must provide performance and payment bonds equal to 100% of the award price, submit a Traffic Control Plan, Work Plan, Equipment List, Personnel List, and evidence of required insurance. The Contractor must also comply with MS4 Permit compliance tracking and reporting, including GPS-verified documentation of all activities. The Contractor must contact GDOT ITS Locates prior to work and comply with utility marking requirements. Work is prohibited during specified holiday periods and between 6:30 AM and 8:30 AM and 3:30 PM to 6:00 PM on weekdays.

On PublicBidSearch: the original bid posting, 2 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 17, 2026
Time stated in bid documents
Nov 17, 2026, 5:00 PM Eastern Time
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
150 days from the Prework Meeting
Documents analyzed
2

Scope of work

  • Pipe lining at 5 locations on SR 3 in Bartow County
  • Pipe lining at 8 locations on SR 53 in Gordon County
  • Removal of sediment and debris from drainage pipes
  • Grouting of annular space between host pipe and carrier pipe
  • Sealing of pipe ends
  • Hauling and disposal of removed materials

Steps to Bid

  1. 1

    Register and log in to GA@WORK Marketplace.

  2. 2

    Review the Invitation to Bid (ITB) and all attachments, including Exhibits 1-5 and Appendices.

  3. 3

    Submit written questions to the Issuing Officer by 2:00 PM on November 6, 2026, via email. was Nov 6, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Complete and sign the ITB Bid Form (Table 12) and all required attachments.

  5. 5

    Upload the complete, signed ITB Bid Form and all required attachments to GA@WORK Marketplace. was Nov 17, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  6. 6

    Ensure all mandatory documents are submitted electronically by the deadline. was Nov 17, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Contract duration

150 calendar days from the Prework Meeting

Submission

Electronic portal

NAICS

237190

How to submit

The complete bid package must be submitted electronically via GA@WORK Marketplace. The ITB Bid Form (Table 12) and all required attachments must be uploaded as a single package. The bid must be submitted by 5:00 PM EST on November 17, 2026. Bids received outside of GA@WORK Marketplace will not be accepted.

In person/mail: 30 Great Valley Parkway, White, GA 30184

Get alerts for bids like this

New drainage and stormwater bids in Georgia

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The Contractor must furnish all labor, materials, equipment, tools, traffic control, and incidentals necessary to perform the work. Work must begin no later than 30 days after the Prework Meeting and be completed no later than 150 days after the Prework Meeting. The Contractor must comply with the GDOT Standard Specifications, applicable Qualified Products List (QPL), and Construction Details and Standards. The Georgia Security and Immigration Compliance Act Affidavit must be submitted.

Documents

  • 1465901-2121916238ITB_Drainage_A1_Bartow-Gordon_3_Routes_P.docx
  • 1465901-event.pdf5 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby