OpenRFQCloses Nov 25, 2026

T32-D1-PavePres-SR180-Union-194750

Department of TransportationGeorgia#48400-eRFQ-002153-2027

Work includes milling, patching, debris removal, traffic control, and pavement marking replacement. Bids must be submitted electronically via GA@WORK Marketplace by 5:00 PM EST on November 25, 2026. Work must begin within 60 days and be completed within 180 days of the Prework Meeting. The Contractor must use a Materials Transfer Vehicle (MTV) for asphalt work and comply with all GDOT specifications and QPL requirements.

Open Original Bid Source Pro

Overview

Due
Nov 25, 2026
Time stated in bid documents
Nov 25, 2026, 5:00 PM Eastern Time
Bid bond
100%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
180 days after the Prework Meeting
Documents analyzed
2

Scope of work

  • Mill and patch SR 180 from MP 7.8 to 14.53 in Union County, GA
  • Install 2.0 inches of 12.5 mm Superpave for 2.0-inch milling
  • Install 2.5 inches of 19 mm Superpave and 2.0 inches of 12.5 mm Superpave for 4.5-inch milling
  • Install two lifts of 2.0 inches of 19 mm Superpave and 2.0 inches of 12.5 mm Superpave for 6.0-inch milling
  • Replace temporary and permanent pavement markings after paving

Steps to Bid

  1. 1

    Register and log in to GA@WORK Marketplace.

  2. 2

    Review the full ITB, Exhibits 1–4, and all attachments.

  3. 3

    Submit written questions to the Issuing Officer by 2:00 PM EST on November 10, 2026. by Nov 10, 2026, 2:00 PM

  4. 4

    Prepare and submit the complete bid package via GA@WORK Marketplace by 5:00 PM EST on November 25, 2026. by Nov 25, 2026, 5:00 PM

What you'll need

Contract duration

180 days after the Prework Meeting

Submission

Electronic portal

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope covers deep patching with Superpave asphalt, crack sealing, and installation of temporary and permanent pavement markings. All work must comply with GDOT Standard Specifications, Qualified Products List (QPL), and Construction Details. Work is restricted to 9:00 AM – 5:00 PM Monday–Friday, with lane closures prohibited during holidays and special events. The Contractor must submit a Traffic Control Plan, Work Plan, Equipment List, and Personnel List. Liquidated damages apply at $160 per day for delays under $1.5M, and $479 per day for delays over $1.5M.

Key dates

Questions due
Nov 10, 2026, 2:00 PM Eastern Time
Bids due
Nov 25, 2026

Documents

  • 1466522-2122721007SR_180_Union_Co_Patching_Contract_-_P.docx
  • 1466522-event.pdf5 pages

See all documents · Download with Pro

Contact

Agency contact for this bidName, email & phone — included with ProPro

More from this agency

Similar open bids

Closing this week nearby