OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Talladega County — Resurfacing, Guardrail, Guardrail End Anchors, Cross Slope Modifications, Lane Reduction and Lane Widening, and 2' Safety Widening on SR-235

Alabama Department of Transportation — ALDOTAlabama#STPAA-HSIP-FMGR-0235(506)

This is a forecast for a construction project in Talladega County, Alabama. The project involves resurfacing, guardrail installation, cross slope modifications, lane reduction, lane widening, and safety widening on SR-235. The tentative letting date is December 4, 2026. The contract time is 110 Working Days.

On PublicBidSearch: the original bid posting and 2 bid documents for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Time stated in bid documents
Dec 4, 2026, 4:00 AM Central Time
Bid bond
Bond Required
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Resurfacing on SR-235 from SR-38 (US-280) to CR-190 (Kings Chapel Road)
  • Installation of guardrail and guardrail end anchors

Steps to Bid

What you'll need

Bid security

Required

Bond Required

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work Type: (WP2) PREVENTATIVE MAINTENANCE LEVEL 2 W/ SAFETY WIDEN. F/A Project Number: STPAA-HSIP-FMGR-0235(506). ALDOT Project Number: 100075384. Length: 9.21 mi.

Key dates

Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • FutureLettings.pdf66 pages
  • PITEMS040.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar bids in Alabama

Closing soon in Alabama