OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Perry County — Resurfacing, Guardrail and End Anchors, 2' Safety Widening and Scoring on SR-8 (US-80) from Marengo County Line to Dallas County Line

Alabama Department of Transportation — ALDOTAlabama#NH-HSIP-FMGR-0008(617)

This project in Perry County, Alabama, involves resurfacing, guardrail and end anchor installation, 2' safety widening, and scoring on SR-8 (US-80) from the Marengo County Line to the Dallas County Line. The estimated value is between $4,594,606 and $5,615,630. The contract time is 75 working days. The tentative letting date is December 4, 2026.

On PublicBidSearch: the original bid posting and 2 bid documents for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Documents analyzed
2 published · 1 analyzed

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Work Type: (WP2) PREVENTATIVE MAINTENANCE LEVEL 2 W/ SAFETY WIDEN F/A Project Number: NH-HSIP-FMGR-0008(617) ALDOT Project Number: 100080474 County: Perry Length: 6.12 mi Tentative Letting Date: December 04, 2026. The project is for constructing the Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from the Marengo County Line to the Dallas County Line. Length 6.144 mi.

Key dates

Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • FutureLettings.pdf66 pages
  • PITEMS024.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar bids in Alabama

Closing soon in Alabama