ClosedIFB

Temporary Stabilization of Bulkhead, Lake Livingston State Park

Parks & Wildlife Department - 802Texas#802-27-86931

The Texas Parks and Wildlife Department is seeking bids for temporary stabilization of an eroding bulkhead at Lake Livingston State Park in Polk County, Texas. Work includes stabilizing the bulkhead to prevent property loss and ensure visitor safety, with requirements to minimize environmental impact and protect cultural resources. The solicitation is for construction services under the NAICS code 91223-Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.). Questions may be directed to Kelly Hamby.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 19, 2026, 3:00 PM CT
Time stated in bid documents
Nov 19, 2026, 3:00 PM Central Time
Submission
electronic portal

Scope of work

  • Prevent further property loss and visitor safety risks
  • Protect nearby cultural resources during construction
  • Perform temporary stabilization per TPWD specifications

Steps to Bid

  1. 1

    Review the full solicitation and specifications available at the provided link

  2. 2

    Submit questions to Kelly Hamby by 3:00 PM on November 19, 2026, Central Time was Nov 19, 2026, 3:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  3. 3

    Submit bid response by 3:00 PM on November 19, 2026, Central Time was Nov 19, 2026, 3:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

What you'll need

Submission

Electronic portal

NAICS

91223

Get alerts for bids like this

New marine and coastal bids in Texas

This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.

Get alerts — free

Project details

The contractor shall provide services to stabilize the eroding bulkhead area, prevent further loss of property, and mitigate safety risks to visitors within the state park.

Documents

  • ESBD_574731_1793999114223_IFB_802-27-86931_Temporary_Stabilization_of_Bulkhe.pdf

See all documents · Download with Pro

More from this agency

Similar bids in Texas

Closing soon in Texas