Time and Effort Reporting System Design, Installation, and Ongoing Support
University of ConnecticutStorrs, Tolland, Connecticut#CDR103026
Vendors must submit a detailed implementation plan, staffing plan, financial proposal with itemized costs for three years, and references from comparable higher education projects. The contract term is three years with potential renewals.
Overview
- Due
- Dec 2, 2026
- Time stated in bid documents
- Dec 2, 2026, 2:00 PM Eastern Time
- Submission
- electronic portal
- Contract term
- three (3) years + two additional one-year renewal terms
- Documents analyzed
- 3 published · 2 analyzed
- Required submission items
- 8 items · full checklist with Pro
Scope of work
- Design, furnish, install, and provide ongoing support for a Time and Effort Reporting System
- Integrate with UConn’s CORE-CT (PeopleSoft/Oracle Cloud) and Kuali Financials
- Support variable reporting periods (annual, semester-based)
- Data migration and system integration
- User training and ongoing technical support
Steps to Bid
- 1
Register and Acknowledge Portal Requirements
Log in to the HuskyBuy portal, acknowledge the mandatory prerequisites, and confirm your intent to bid.
- 2
Submit Questions via the Q&A Board
Submit all questions through the Q&A Board in the HuskyBuy portal before the deadline. Questions must be submitted by 12/2/2026, 2:00 PM EST. No informal communications with University staff are permitted.
- 3
Complete the Proposal Response
Respond to all questions in the RFP, including: firm background, executive summary, staffing plan, system functionality, implementation plan, financial proposal, and references. Upload a detailed timeline, staffing plan, and sample deliverables as optional attachments.
- 4
Submit the Financial Proposal
Provide a complete, itemized cost proposal in PDF format, including all fees for design, implementation, data migration, training, technical support, hosting, maintenance, upgrades, and SLA credits for three years. Include alternate payment terms if not accepting 2% 15 days, Net 45.
- 5
Finalize and Submit the Proposal
Ensure all required documents are uploaded in the correct sections of the HuskyBuy portal. Submit the proposal before the deadline.
What you'll need
Submission
Electronic portal
NAICS
541512
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 8-item required-submittals checklist
Cancel anytime · no card to browse
Key dates
- Pre-bid meeting
- Nov 15, 2026, 10:00 AM Eastern Time
- Bids due
- Dec 2, 2026
Documents
- 1466901-2123188214UConn_Time_and_Effort_Rpting_Sys_RFP_CDR103026_Template_Co.pdf18 pages
- 1466901-2123188214UConn_Time_and_Effort_Rpting_Sys_RFP_CDR103026_Template_Co.pdf18 pages
- 1466901-event.pdf11 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- On-Call - General Architecture Services — closes Nov 12, 2026
- On-Call - General Architecture Services — closes Nov 12, 2026
- On-Call - CEPA/NEPA Impact Evaluation Services — closes Nov 17, 2026
- On-Call CEPA/NEPA Impact Evaluation Services — closes Nov 17, 2026
- On-Call - Mechanical, Electrical, Plumbing, Fire Protection/Fire Alarm/Security Services — closes Nov 18, 2026
Similar open bids
- On-Call Structural Engineering Services for University of Connecticut — University of Connecticut
- On-Call Geotechnical Engineering Services — University of Connecticut
- On-Call - Structural Engineering — University of Connecticut
Closing this week nearby
- Modernization Consulting and Grant Application and Administration Services — closes Nov 9, 2026
- Rental of 400 CFM Low Pressure Air Compressor System — closes Nov 9, 2026
- Replacement of Bridge No. 05350 Bosworth Road over Mashamoquet Brook — closes Nov 9, 2026
- Prospect Police Department Furnace Replacement — closes Nov 9, 2026
- Fire Hydrant Installation and Water Main Wet Cuts – RFP No. SNEW-WD-2026-001 — closes Nov 9, 2026