Town Hall Roof Replacement
Town of South Palm BeachSouth Palm Beach, Florida#ITB#11-02-2026
The project covers approximately 6,800 sq ft of sloped and 500 sq ft of low-slope roofing. Contractors must submit a base bid for .032 aluminum panels and an alternate bid for .040 panels. All labor, materials, permits, inspections, disposal, cleanup, and site protection (including daily magnetic sweeping) are required. Work must comply with the Florida Building Code (2023), wind uplift standards, and OSHA. Excluded: structural repairs beyond minor replacement, interior work, asbestos abatement, and mechanical/electrical/plumbing changes. Warranty: 5-year labor and 10-year material for low-slope; 10-year labor and 25-year material for metal. A non-mandatory pre-bid meeting is on November 12, 2026, at 3:00 PM EST. Bids are due November 30, 2026, at 2:00 PM EST. Liquidated damages: $904/day for delay in substantial completion, $226/day for final completion.
On PublicBidSearch: the original bid posting, 4 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Nov 30, 2026
- Time stated in bid documents
- Nov 30, 2026, 2:00 PM Eastern Time
- Submission
- mail, hand delivery
- Contract term
- 120 calendar days from the Notice to Proceed
- Documents analyzed
- 4 published · 1 analyzed
- Required submission items
- 7 items · full checklist with Pro
Scope of work
- Remove and replace 6,800 sq ft of sloped roofing
- Install standing seam aluminum roofing with Kynar 500 finish
- Install two-ply SBS modified bitumen system on low-slope areas
- Provide magnetic sweeping daily and at end of each workday
- Remove and dispose of all roofing debris and construction waste
Steps to Bid
What you'll need
Contract duration
120 calendar days from the Notice to Proceed
Submission
Mail, Hand delivery
NAICS
236220
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 1 watch-out that disqualifies bidders
- The 7-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project includes removal of the existing roof, installation of a new standing seam aluminum roofing system with Kynar 500 finish, replacement of low-slope roof sections with a two-ply SBS modified bitumen system, and all associated roofing components required to provide a complete, watertight, code-compliant roof system. The contractor shall furnish all labor, materials, equipment, engineering, permits, inspections, demolition, disposal, cleanup, and related services necessary to complete the project. The completed roof system must comply with all applicable building code requirements and project specifications. The project covers approximately 6,800 square feet of sloped roofing and 500 square feet of low-slope roofing. The contractor shall obtain and pay for all required permits, inspections, and approvals. Work must comply with the Florida Building Code (8th Edition, 2023), wind uplift requirements, manufacturer installation standards, and OSHA safety standards.
Key dates
- Questions due
- Nov 12, 2026, 3:00 PM Eastern Time
- Pre-bid meeting
- Nov 12, 2026, 3:00 PM Eastern Time
- Bids due
- Nov 30, 2026
Documents
- ITB 11-02-2026 TOWN HALL ROOF REPLACEMENT 2611051514599120.pdf45 pages
- ITB 11-02-2026 TOWN HALL ROOF REPLACEMENT 2611051514599120.pdf45 pages
- Addendum No. 1 Roof Replacement.pdf1 pages
- Addendum No 2. Roof Replacement.pdf20 pages
Similar bids near South Palm Beach
- JEAGA MIDDLE SCHOOL - ROOFING - ITB #27-26D LOCATION: 3777 N. JOG RD. · Palm Beach · closes Jan 4, 2027
Closing soon near South Palm Beach
- Landscaping and Grounds Maintenance Services – Request for Proposals · Hypoluxo · closes Nov 30, 2026
- Landscaping and Grounds Maintenance Services · Hypoluxo · closes Nov 30, 2026
- Boynton Harbor Marina Fuel System Electrical Conduit & Piping Transition Sump Repairs · Boynton Beach · closes Dec 1, 2026
- Clearflow Washwater System, Preventative Maintenance and Repair · West Palm Beach · closes Dec 2, 2026
- 26-091R - Galaxy Sand Pine Scrub Preserve Urban Forestry Education Initiative (Grant Funded) · Boynton Beach · closes Dec 4, 2026