OpenConstructionCloses Dec 4, 2026

Trade Package - Cargo Building 720.1 & GSE Building 742 Project - TP-09C1 R3 - Tiling

San Francisco International Airport — Design-BuilderSan Francisco, California#11984.66 - TP-09C1 R3

This solicitation is for tiling work on Cargo Building 720.1 and the GSE Maintenance Facility (Building 742) at San Francisco International Airport. The scope includes wall and floor tile, terrazzo, waterproofing membranes, trims, sealants, and caulking. Bidders must be prequalified and approved by the Design-Builder prior to submission. The estimated cost is $224,000. The work is located in San Francisco, CA. The bid is due 15 business days after posting, by 4:00 PM. A 16% CMD LBE participation requirement applies. The Design-Builder is Skanska USA Building.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026
Time stated in bid documents
Dec 4, 2026, 5:00 PM Pacific Time

Scope of work

  • Apply waterproofing membranes and sealants at joints and dissimilar materials
  • Install trims and finishes for tile and terrazzo surfaces
  • Complete all tiling work in accordance with project specifications
  • Demolish existing Building 730 prior to construction

Steps to Bid

  1. 1

    Request prequalification materials from the Design-Builder contact.

  2. 2

    Complete the prequalification process and obtain approval from Skanska USA Building.

  3. 3

    Submit the bid proposal by 4:00 PM, 15 business days after posting. by Dec 4, 2026, 5:00 PM

What you'll need

Prequalification

Required

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This trade package involves tiling work for the Cargo Building 720.1 and the ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742), both part of a larger replacement project at San Francisco International Airport. The trade package is part of a design-builder procurement process managed by Skanska USA Building. Unapproved bidders will not be considered. The main trades involved are precast installers, carpenters, operators, and laborers.

Key dates

Bids due
Dec 4, 2026

More from this agency

Similar bids near San Francisco

Closing soon near San Francisco