Trade Package - Cargo Building 720.1 & GSE Building 742 Project - TP-09C1 R3 - Tiling
San Francisco International Airport — Design-BuilderSan Francisco, California#11984.66 - TP-09C1 R3
This solicitation is for tiling work on Cargo Building 720.1 and the GSE Maintenance Facility (Building 742) at San Francisco International Airport. The scope includes wall and floor tile, terrazzo, waterproofing membranes, trims, sealants, and caulking. Bidders must be prequalified and approved by the Design-Builder prior to submission. The estimated cost is $224,000. The work is located in San Francisco, CA. The bid is due 15 business days after posting, by 4:00 PM. A 16% CMD LBE participation requirement applies. The Design-Builder is Skanska USA Building.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 4, 2026
- Time stated in bid documents
- Dec 4, 2026, 5:00 PM Pacific Time
Scope of work
- Apply waterproofing membranes and sealants at joints and dissimilar materials
- Install trims and finishes for tile and terrazzo surfaces
- Complete all tiling work in accordance with project specifications
- Demolish existing Building 730 prior to construction
Steps to Bid
- 1
Request prequalification materials from the Design-Builder contact.
- 2
Complete the prequalification process and obtain approval from Skanska USA Building.
- 3
Submit the bid proposal by 4:00 PM, 15 business days after posting. by Dec 4, 2026, 5:00 PM
What you'll need
Prequalification
RequiredPursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This trade package involves tiling work for the Cargo Building 720.1 and the ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742), both part of a larger replacement project at San Francisco International Airport. The trade package is part of a design-builder procurement process managed by Skanska USA Building. Unapproved bidders will not be considered. The main trades involved are precast installers, carpenters, operators, and laborers.
Key dates
- Bids due
- Dec 4, 2026
More from this agency
- South Field Industrial Waste System Improvements · closes Dec 7, 2026
- Prequalifications for T4 Renumbering — Trade Package TP-3005 · closes Dec 7, 2026
- WGS Standard Metal Frames New Profile Dies — Trade Package TP-3005 for Wayfinding Enhancement Program Phase 2 · closes Dec 7, 2026
- AirTrain Medium Voltage Cable Replacement Phase 1 · closes Dec 22, 2026
- Design & Construction Business Forecast - Q4 2026 through Q1 2027 · closes Jan 1, 2027
Similar bids near San Francisco
- Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Repairs · San Francisco · closes Dec 11, 2026
- LULA Elevator Trade Subcontractor for 100 McAllister Tower Remodel · San Francisco · closes Dec 11, 2026
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS · San Francisco · closes Dec 2, 2026
- Temporary Lodging for USCG PSU 312 · San Francisco · closes May 8, 2027
- Mission Bay ECDC: Bid Package 1.1 (Plumbing and Mechanical) REBID · San Francisco · closes Dec 11, 2026
Closing soon near San Francisco
- The San Francisco School: E-Rate FY2027 Category 2 - Wireless Access Points and Necessary Software and Licenses;… · San Francisco · closes Nov 26, 2026
- Oily Waste Offload from USCGC Alder (WLB-216) at USCG Sector San Francisco · San Francisco · closes Nov 27, 2026
- Regulation Division Annual Renewal Process Assessment RFP · San Francisco · closes Nov 30, 2026
- GOLDEN GATE SUSPENSION BRIDGE SEISMIC RETROFIT CONTRACT 1 NORTH AND SOUTH TOWERS AND NORTH AND SOUTH SIDE SPANS ENERGY… · San Francisco · closes Dec 1, 2026
- Program Evaluation Services for the Local Community Benefits Fund · San Francisco · closes Dec 1, 2026