LULA Elevator Trade Subcontractor for 100 McAllister Tower Remodel
University of California College of the Law San FranciscoSan Francisco, California#148316
This is a trade subcontractor opportunity for LULA Elevator work on the 100 McAllister Tower Remodel project. The Construction Manager/General Contractor is Plant Construction. Bidders must respond via the BuildingConnected portal. No responses will be accepted directly by UC Law San Francisco.
On PublicBidSearch: the original bid posting and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 11, 2026
- Time stated in bid documents
- Dec 10, 2026, 4:00 PM Pacific Time
- Submission
- online portal
Scope of work
- Elevator system installation and integration
- Work to be performed under Plant Construction's CM/GC oversight
- Response required via BuildingConnected portal only
Steps to Bid
- 1
Register on the BuildingConnected portal using the project link: Official linkPro by Dec 11, 2026, 4:00 PM
- 2
Submit your response through the portal before the deadline by Dec 11, 2026, 4:00 PM
What you'll need
Submission
Online portal
NAICS
91013
How to submit
Responses must be submitted via the BuildingConnected portal at Official linkPro. No paper or email submissions are accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This solicitation is for trade subcontractors, specifically for LULA Elevator work. UC Law San Francisco is not accepting responses directly; bidders must respond through the project portal at [link available with Pro].
Key dates
- Bids due
- Dec 11, 2026
Similar bids near San Francisco
- USCG STA SAN FRANCISCO (45667) FY27 DD REPAIRS · San Francisco · closes Dec 2, 2026
- Temporary Lodging for USCG PSU 312 · San Francisco · closes May 8, 2027
- Mission Bay ECDC: Bid Package 1.1 (Plumbing and Mechanical) REBID · San Francisco · closes Dec 11, 2026
- Design & Construction Business Forecast - Q4 2026 through Q1 2027 · San Francisco · closes Jan 1, 2027
- General Engineering (A-License) Construction, San Francisco,... Cost: The Maximum Contract Amount is $5,000,000 · San Francisco · closes Dec 11, 2026
Closing soon near San Francisco
- GOLDEN GATE SUSPENSION BRIDGE SEISMIC RETROFIT CONTRACT 1 NORTH AND SOUTH TOWERS AND NORTH AND SOUTH SIDE SPANS ENERGY… · San Francisco · closes Dec 1, 2026
- Program Evaluation Services for the Local Community Benefits Fund · San Francisco · closes Dec 1, 2026
- 8-inch Ductile Iron Water Main Replacement and Sewer Line Upgrade with Paving Renovation on Harkness Ave., Goettingen… · San Francisco · closes Dec 4, 2026
- Trade Package - Cargo Building 720.1 & GSE Building 742 Project - TP-09C R2 - Flooring, Base and Floor Sundries · San Francisco · closes Dec 4, 2026
- Spear Street Substation Project – Request for Interest (RFI No. 002) · San Francisco · closes Dec 5, 2026