OpenRFPCloses Dec 3, 2026

Replacement of Suffield Street Bridge Over Unnamed Brook

Town of Suffield, CTSuffield, Connecticut

The project involves replacing a concrete pipe culvert with a precast concrete box culvert, including headwalls, roadway reconstruction, and site restoration. A pre-bid meeting is scheduled for Tuesday, November 17, 2026, at 10:00 AM at the site. The contract completion time is 165 consecutive calendar days from the Notice to Proceed. Liquidated damages will apply for delays.

On PublicBidSearch: the original bid posting, 5 bid documents and the agency contact (name only) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName only — included with ProPro

Overview

Due
Dec 3, 2026
Time stated in bid documents
Dec 3, 2026, 2:00 PM Eastern Time
Submission
mail, hand delivery
Documents analyzed
5 published · 1 analyzed

Scope of work

  • Replace existing 3-foot-diameter reinforced concrete pipe culvert with a new precast concrete box culvert.
  • Install cast-in-place concrete headwalls.
  • Reconstruct roadway.
  • Place metal beam rail.
  • Perform associated regrading and turf restoration.
  • Perform other miscellaneous site work.

Steps to Bid

  1. 1

    Attend Pre-Bid Meeting was Nov 17, 2026, 10:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    A pre-bid meeting will be held at the site.

  2. 2

    Submit Written Requests for Interpretation was Nov 26, 2026, 2:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

    Requests for interpretation must be received at least seven (7) days prior to the bid opening date of December 03, 2026.

What you'll need

Contract duration

165 consecutive calendar days of the issuance of the Notice to Proceed

Submission

Mail, Hand delivery

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work described above includes furnishing, installing, and incorporating all materials and equipment into the project, as well as performing or providing all labor, supervision, equipment, and services unless otherwise noted within the bid documents for the lump sum base bid. The project is being bid together with the Hickory Street Bridge and Copper Hill Road Bridge projects, and bidders may bid on one, two, or all three projects. A separate proposal and bid security must be submitted for each project. Bidders may also offer a fixed dollar deduction for any pair of projects or for all three. The contract will be substantially completed within 165 consecutive calendar days of the issuance of the Notice to Proceed. Liquidated damages for delay are $750.00 per calendar day for substantial completion and $350.00 per calendar day for final completion.

Key dates

Questions due
Nov 26, 2026, 2:00 PM Eastern Time
Pre-bid meeting
Nov 17, 2026, 10:00 AM Eastern Time
Bids due
Dec 3, 2026

Documents

  • 20261105_Bid_Document_Suffield_Street_Optimized11.pdf220 pages
  • 20261105_SuffieldStreet_CTDOTSTANDARDSHEETS1.pdf
  • 20261105_SuffieldStreet_FDCombinedPlans1.pdf
  • Suffield_Street_Addendum_No_1_Accessible.pdf1 pages
  • 20261125SuffieldStBridgeADDENDUM2.pdf14 pages

See all documents · Download with Pro

More from this agency

Similar bids in Connecticut

Closing soon in Connecticut