Intersection Improvements on SR-69, Tuscaloosa County, AL — Grading, Drainage, Pavement, Lighting, Traffic Signals, ITS, and Traffic Stripe (Phase 1)
Alabama Department of Transportation — ALDOTTuscaloosa, Alabama#NH-0069(581)
This is a construction solicitation for Phase 1 of intersection improvements on SR-69 in Tuscaloosa County, Alabama. The work includes grading, drainage, pavement (asphalt and concrete), lighting, traffic signals, ITS infrastructure, traffic markings, and removal of existing structures. The project is 1.401 miles long and must be completed in 330 working days. The estimated contract value is between $14.7 million and $18.0 million. Bidders must submit a $5.00 bid proposal and may purchase plans for $125.00 per set.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name only) for this bid.
Contact
Agency contact for this bidName only — included with ProProOverview
- Due
- Dec 4, 2026, 4:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 4:00 AM Central Time
- Submission
- mail, hand delivery
- Documents analyzed
- 1
- Required submission items
- 1 items · full checklist with Pro
Scope of work
- Clearing and grubbing of approximately 9 acres
- Removal of existing structures, culverts, guardrails, curbs, and inlets
- Excavation and borrow excavation for roadbed and drainage
- Installation of storm sewer and roadway pipes
- Construction of concrete sidewalks, curbs, and median barriers
- Pavement construction including bituminous base, wearing surface, and tack coat
Steps to Bid
- 1
Register with ALDOT and obtain access to the bid portal.
- 2
Purchase the bid proposal for $5.00 and the plans for $125.00 per set.
- 3
Attend the pre-bid meeting (if any) and submit any questions by the deadline.
What you'll need
Contract duration
330 working days from notice to proceed
Submission
Mail, Hand delivery
NAICS
237130
How to submit
Submit one original and one electronic copy on a USB drive inside a sealed envelope. The envelope must be marked with the bid number and the date of submission.
In person/mail: Alabama Department of Transportation, 5000 County Line Road, Montgomery, AL 36109
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 1-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Construction of Phase 1 Intersection Improvements on State Route 69 in Tuscaloosa County, Alabama, from a point 0.280 mile north of the junction of Mimosa Park Road to the I-20/I-59 Overpass. Scope includes grading, drainage, pavement (including Superpave bituminous concrete wearing and binder layers, micro-milling, tack coat, and asphalt base), lighting (luminaire assemblies, poles, foundations, junction boxes, and control centers), traffic signals (signal heads, controllers, junction boxes, poles, and foundations), intelligent traffic systems (ITS) infrastructure (fiber optic cables, conduit, splice closures, network devices, cameras, radar detection systems, and ITS control units), traffic control signage and markings (permanent and temporary), removal of existing structures and utilities (including culverts, guardrails, curbs, inlets, junction boxes, overhead signs, and traffic control units), excavation, borrow excavation, backfill, concrete work (sidewalks, median barriers, culverts, and structures), storm sewer and roadway pipe installation, erosion control, and temporary traffic control measures. The project spans 1.401 miles and is scheduled for completion in 330 working days. The bracket estimate is $14,705,686 to $17,969,949.
Key dates
- Bids due
- Dec 4, 2026, 4:00 AM CT
Documents
- PITEMS016.pdf5 pages
More from this agency
- Left and Right Turn Lane Installation (Grading, Drainage, Pavement, and Traffic Stripe) on SR-106 at 0.250 Mile East… — closes Dec 4, 2026
- Marshall County — Micro-Milling, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-1 (US-431) from the… — closes Dec 4, 2026
- Roadway Improvements (Sign Replacement) on I-565 from I-65 Interchange to SR-2 (US-72) Interchange, Madison and… — closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… — closes Dec 4, 2026
- Resurfacing and Traffic Stripe on CR-77 from CR-22 to SR-74 (US-278) Southeast of Addison, Winston County, Alabama — closes Dec 4, 2026
Similar open bids
- SR-759 (East Gadsden Connector) Construction — Alabama Department of Transportation
- Camera Systems & Traffic Signal Components — City of Tuscaloosa
- Baldwin County Intersection Improvements at SR-42 (US-98) and Volanta Avenue — Alabama Department of Transportation
- Traffic Signal Cabinets, Controllers and Related Parts — Invitation to Bid 27-05 — City of Birmingham
Closing this week nearby
- Westlaw Print Renewal Subscription — closes Nov 20, 2026
- Xerox Copier Maintenance and Repair Services — closes Nov 20, 2026
- Periodic Bid for Drainage Projects-2027 — closes Nov 20, 2026
- Miscellaneous Equipment Repair and Maintenance Services for Utility Vehicles and Trailers — closes Nov 20, 2026
- Sign Shop Pest Control Services — Monthly Maintenance, Termite & Rodent Control, Extermination, and Fumigation — closes Nov 20, 2026