Tuttle Rd Pump Station and Force Main Rehabilitation Project
Portland Water DistrictPortland, Maine
Scope includes reconfiguring the wet well into a submersible pump station, replacing the generator with electrical upgrades, rehabilitating the force main via FFRP or CIPP lining, replacing 300 feet of pipe with encased ductile iron, installing a bypass manhole and valving, and constructing a temporary force main. A non-mandatory pre-bid conference is scheduled for December 15, 2026, at 9:00 AM at 229 Tuttle Rd, Cumberland. A bid bond of 5% of the total bid is required. Performance and payment bonds of 100% of the contract price are required prior to contract execution.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 19, 2027
- Bid bond
- 5%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- hand delivery
- Documents analyzed
- 1
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Install separate concrete valve vault
- Rehabilitate 2,550 ft of 8” ductile iron force main via CIPP or FFRP
- Replace 300 ft of pipe with encased ductile iron
Steps to Bid
- 1
Register and obtain contract documents
Request electronic copies of contract documents from Wesley Gilbert, Purchasing Agent, at [email available with Pro] or 207-774-5961 ext. 1007. Paper copies are not available.
- 2
Attend pre-bid conference (optional)
A non-mandatory pre-bid conference will be held on December 15, 2026, at 9:00 AM at 229 Tuttle Rd, Cumberland. Attendance by subcontractors is encouraged but not required.
- 3
Prepare and submit bid
Submit a sealed bid, accompanied by a bid bond in the amount of 5% of the total bid, by 2:00 PM local time on January 19, 2027. Bids may be hand-delivered between 1:00 PM and 2:00 PM to the Nixon Training Room entrance at 225 Douglass Street, Portland, ME. Bids must be delivered in person; no mail or email submissions are accepted.
What you'll need
Contract duration
The Bidder is responsible for determining if there are Addenda to the Project by viewing the P.W.D. project website located at [link available with Pro]. The bidder is responsible for incorporating addenda into their Bid and referencing the number and date on Article 3 – Bidder’s Representations
Submission
Hand delivery
NAICS
237130
How to submit
Bids must be hand-delivered between 1:00 PM and 2:00 PM on January 19, 2027, to the Nixon Training Room entrance at 225 Douglass Street, Portland, ME. Bids must be sealed and accompanied by a bid bond in the amount of 5% of the total bid. No mail or email submissions are accepted.
In person/mail: 225 Douglass Street, Portland, ME 04102
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Construction of the Tuttle Rd Pump Station and Force Main Rehabilitation Project in Cumberland, Maine. Work includes reconfiguration of the existing precast concrete wet well into a submersible pump station, installation of a separate concrete valve vault, replacement of the generator in the control building with significant electrical upgrades, rehabilitation of approximately 2,550 feet of 8-inch ductile iron sewer force main using either flexible fabric-reinforced pipe (FFRP) or cured-in-place pipe (CIPP) lining, replacement of approximately 300 feet of 8-inch ductile iron pipe with new pipe wrapped in polyethylene encasement, installation of a new bypass manhole and valving, and installation of a temporary sewer force main with related appurtenances. Electronic copies of contract documents are available upon request. Performance bond in the amount of 100% of the contract price and labor and material payment bonds in like amount are required prior to contract execution.
Key dates
- Pre-bid meeting
- Dec 15, 2026, 9:00 AM Eastern Time
- Bids due
- Jan 19, 2027
Documents
- TuttlePS_NoticeToBidders_11.25.26.pdf2 pages
More from this agency
- Congress Street and Forest Street Water Main Replacement, Portland · closes Dec 3, 2026
- Cape Elizabeth WWTF Boiler Replacement · closes Dec 7, 2026
- Crane and Hoist Preventative Maintenance Services for Portland Water District · closes Dec 10, 2026
- India St Pump Station Check Valve Replacement · closes Dec 21, 2026
- Peabbles Point Pump Station Building Replacement & Electrical Modifications · closes Dec 21, 2026
Closing soon near Portland
- HVAC Preventative Maintenance Program · Portland · closes Nov 30, 2026
- Request for Bids - 2019 Iron Sleek Outdoor Ice Rink - Town of Kennebunkport · Kennebunkport · closes Dec 2, 2026
- School Photography Services for 2027–2028 Academic Year · Kennebunk · closes Dec 3, 2026
- Install Bridge Crane at Joint National Guard Field Maintenance Shop (FMS#1) · Saco · closes Dec 3, 2026
- Custodial and Public Safety Services for Alfred Work Centers · Alfred · closes Dec 3, 2026