OpenConstructionCloses Jan 19, 2027

Tuttle Rd Pump Station and Force Main Rehabilitation Project

Portland Water DistrictPortland, Maine

Scope includes reconfiguring the wet well into a submersible pump station, replacing the generator with electrical upgrades, rehabilitating the force main via FFRP or CIPP lining, replacing 300 feet of pipe with encased ductile iron, installing a bypass manhole and valving, and constructing a temporary force main. A non-mandatory pre-bid conference is scheduled for December 15, 2026, at 9:00 AM at 229 Tuttle Rd, Cumberland. A bid bond of 5% of the total bid is required. Performance and payment bonds of 100% of the contract price are required prior to contract execution.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Jan 19, 2027
Bid bond
5%
Performance bond
100%
Payment bond
100%
Submission
hand delivery
Documents analyzed
1
Required submission items
3 items · full checklist with Pro

Scope of work

  • Install separate concrete valve vault
  • Rehabilitate 2,550 ft of 8” ductile iron force main via CIPP or FFRP
  • Replace 300 ft of pipe with encased ductile iron

Steps to Bid

  1. 1

    Register and obtain contract documents

    Request electronic copies of contract documents from Wesley Gilbert, Purchasing Agent, at [email available with Pro] or 207-774-5961 ext. 1007. Paper copies are not available.

  2. 2

    Attend pre-bid conference (optional)

    A non-mandatory pre-bid conference will be held on December 15, 2026, at 9:00 AM at 229 Tuttle Rd, Cumberland. Attendance by subcontractors is encouraged but not required.

  3. 3

    Prepare and submit bid

    Submit a sealed bid, accompanied by a bid bond in the amount of 5% of the total bid, by 2:00 PM local time on January 19, 2027. Bids may be hand-delivered between 1:00 PM and 2:00 PM to the Nixon Training Room entrance at 225 Douglass Street, Portland, ME. Bids must be delivered in person; no mail or email submissions are accepted.

What you'll need

Contract duration

The Bidder is responsible for determining if there are Addenda to the Project by viewing the P.W.D. project website located at [link available with Pro]. The bidder is responsible for incorporating addenda into their Bid and referencing the number and date on Article 3 – Bidder’s Representations

Submission

Hand delivery

NAICS

237130

How to submit

Bids must be hand-delivered between 1:00 PM and 2:00 PM on January 19, 2027, to the Nixon Training Room entrance at 225 Douglass Street, Portland, ME. Bids must be sealed and accompanied by a bid bond in the amount of 5% of the total bid. No mail or email submissions are accepted.

In person/mail: 225 Douglass Street, Portland, ME 04102

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 4 watch-outs that disqualify bidders
  • The 3-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Construction of the Tuttle Rd Pump Station and Force Main Rehabilitation Project in Cumberland, Maine. Work includes reconfiguration of the existing precast concrete wet well into a submersible pump station, installation of a separate concrete valve vault, replacement of the generator in the control building with significant electrical upgrades, rehabilitation of approximately 2,550 feet of 8-inch ductile iron sewer force main using either flexible fabric-reinforced pipe (FFRP) or cured-in-place pipe (CIPP) lining, replacement of approximately 300 feet of 8-inch ductile iron pipe with new pipe wrapped in polyethylene encasement, installation of a new bypass manhole and valving, and installation of a temporary sewer force main with related appurtenances. Electronic copies of contract documents are available upon request. Performance bond in the amount of 100% of the contract price and labor and material payment bonds in like amount are required prior to contract execution.

Key dates

Pre-bid meeting
Dec 15, 2026, 9:00 AM Eastern Time
Bids due
Jan 19, 2027

Documents

  • TuttlePS_NoticeToBidders_11.25.26.pdf2 pages