OpenConstructionCloses Dec 4, 2026

Trade Package - Cargo Building 720.1 & GSE Building 742 Project - TP-09C R2 - Flooring, Base and Floor Sundries

San Francisco International Airport — Design-BuilderSan Francisco, California#11984.66 - TP-09C R2

The solicitation is for flooring, resilient base, floor sundries, entrance floor mats and frames, and sealants at dissimilar material joints in the Cargo Building 720.1 and GSE Building 742 project at San Francisco International Airport. The scope is part of a 120,000 sq ft cargo facility with 25,000 sq ft of mezzanine office space and a 17,000 sq ft GSE maintenance building. Bidders must be prequalified and approved by Skanska USA Building prior to submission. The bid is due 15 business days after posting. The estimated cost is $572,500. A 16% CMD LBE participation requirement applies.

On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 4, 2026
Time stated in bid documents
Dec 4, 2026, 5:00 PM Pacific Time

Scope of work

  • Install resilient sheet flooring in cargo and office areas
  • Provide and install entrance floor mats and frames
  • Apply sealants and caulking at all dissimilar material joints
  • Complete prequalification and approval with Skanska USA Building prior to bid submission

Steps to Bid

  1. 1

    Request prequalification and approval from Skanska USA Building via contact email.

  2. 2

    Complete and submit bid proposal by 4:00 PM, 15 business days after posting. by Dec 4, 2026, 5:00 PM

What you'll need

Prequalification

Required

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The new cargo facility will be a 120,000 square foot, single-story structure with approximately 95,000 square feet of cargo area and 25,000 square feet of mezzanine office space. It will include landside maneuvering depth from West Field Road for approximately 30 trucks. An ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742) of approximately 17,000 square feet will be constructed on-site but not physically connected to the cargo facility. Demolition of the existing Building 730 is required prior to construction. Unapproved bidders will not be considered. The trade package is part of a larger construction project with a 16% CMD LBE participation requirement.

Key dates

Bids due
Dec 4, 2026

More from this agency

Similar bids near San Francisco

Closing soon near San Francisco