C0720 Coyote Percolation Dam Fish Passage Facility Phase 2
Santa Clara Valley Water District — Construction Contracts & Support #335San Jose, Santa Clara, California#VW0719
Santa Clara Valley Water District is soliciting bids for the construction of a fish passage facility at Coyote Percolation Dam, Phase 2, in San Jose, CA. The scope includes site preparation, dewatering, construction of a 500 LF fish passage lane with engineered streambed materials, separation berm with clay composite liner, grade control structures, fish ladder modifications, new crest gate installation, receiving pool and end sill construction, flow transition chute, drain system, attractant pool modification, channel tie-in, and spillway. Work is divided into five milestones over 724 calendar days. A Class A California contractor’s license is required. A mandatory pre-bid meeting and site visit is scheduled for October 29, 2026, at 10:00 AM PST at Coyote Creek Trailhead, Metcalf Park. Bid bond of 10% of total bid is required. Bid must be submitted electronically via PlanetBids by January 13, 2027, at 2:00 PM PST. Questions must be submitted no later than nine calendar days before the deadline. A Project Labor Agreement (PLA) must be executed and submitted. The estimated cost is $7.5–9 million.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 13, 2027
- Time stated in bid documents
- Jan 13, 2027, 2:00 PM Pacific Time
- Bid bond
- 10%
- Submission
- electronic portal
- Documents analyzed
- 1
Scope of work
- Install grade control structures with boulder drop-pool features
- Modify existing fish ladder with submerged orifices and refuge boxes
- Replace radial gate with new crest gate and control components
- Build reinforced concrete end sill and receiving pool
- Construct flow transition chute and low-flow notch
Steps to Bid
- 1
Register as a vendor on the Valley Water Vendor Portal in PlanetBids.
- 2
Download the Notice to Bidders, Project Plans, Specifications, and Contract Documents from PlanetBids.
- 3
Acknowledge all Addenda on PlanetBids before submitting the bid.
- 4
Attend the mandatory pre-bid meeting and site visit on October 29, 2026, at 10:00 AM PST at Coyote Creek Trailhead, Metcalf Park, San Jose, CA. was Oct 29, 2026, 10:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Submit written questions to Valley Water via PlanetBids no later than nine calendar days before the bid deadline. by Jan 4, 2027, 2:00 PM
- 6
Complete and submit Bid Form No. 11, Project Labor Agreement Acknowledgement, at the time of bid submission. by Jan 13, 2027, 2:00 PM
- 7
Obtain and submit a bid bond in the amount of 10% of the total bid, issued through Surety2000 or Tinubu via PlanetBids. by Jan 13, 2027, 2:00 PM
- 8
Submit the electronic bid through the Valley Water Vendor Portal in PlanetBids by the deadline. by Jan 13, 2027, 2:00 PM
What you'll need
Contract duration
724 calendar days
Submission
Electronic portal
NAICS
59500, 90656, 90779, 91200, 91219, 91300, 91315, 91430, 91438, 91479
How to submit
Submit electronic bid through the Valley Water Vendor Portal in PlanetBids. Bid must be submitted in time for all information to be transferred to PlanetBids before the deadline. Bid bond must be issued through Surety2000 or Tinubu via PlanetBids. Bidder must acknowledge all Addenda on PlanetBids before submitting the bid.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 4 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Scope includes site preparation with preservation fencing, demolition of existing concrete apron and grouted rock slope protection, dewatering and diversion of water from Coyote Percolation Pond and groundwater. Construction of a 500 linear foot fish passage lane using engineered streambed materials (boulders, cobble, gravel), including a low-flow inset channel. Excavation, placement, and compaction of embankment materials to construct a separation berm between the fish lane and historical Coyote Creek channel, with installation of a clay composite liner to limit seepage. Removal of the existing radial gate at the left abutment and installation of a new crest gate with structural, mechanical, and control components. Construction of a reinforced concrete end sill and receiving pool downstream of the crest gate, including formwork, reinforcing steel, concrete placement, and finishing. Installation of a float-activated drain system in the receiving pool with piping, valves, controls, and associated components. Enlargement and deepening of the existing attractant pool through excavation, structural modifications, and finishing to reduce turbulence and improve fish attraction. Demolition and reconstruction of the breached separation berm at Pit 10B, with construction of a stabilized, naturalized channel tie-in to the historical Coyote Creek channel, including grading, bank protection, and stabilization. Construction of a spillway over the separation berm, including excavation, grading, and placement of erosion-resistant materials to convey high flows into Pit 10B and prevent future berm failure. Excavation, backfill, and regrading of the incised historical channel from Pit 10B to the base of the percolation dam using engineered streambed materials. The work is divided into five milestones: (1) Mobilization and site preparation; (2) Season 1 diversion and in-channel construction; (3) Winter shutdown and offsite work; (4) Remobilization and diversion reinstallation (Season 2); (5) Testing, commissioning, and project closeout. The contract time is 724 calendar days. The estimated cost is between $7.5 million and $9 million. Bidder must possess a current Class A California contractor’s license.
Key dates
- Pre-bid meeting
- Oct 29, 2026, 10:00 AM Pacific Time
- Site visit
- Oct 29, 2026, 10:00 AM Pacific Time
- Bids due
- Jan 13, 2027
Documents
- 20261015085205950_10132026_-_Item_4.2_-_Notice_to_Bidders_-_SIGNED.pdf8 pages
More from this agency
- Purchase and Delivery of Filled and Unfilled Sandbags · closes Dec 1, 2026
- Benefits Assessment & Special Parcel Tax Administrative Services · closes Dec 2, 2026
- On-Call Public Opinion, Research, Survey & Polling Services · closes Dec 3, 2026
- Supervisory Control and Data Acquisition System (SCADA) Platforms · closes Dec 3, 2026
- Sunnyvale East and West Channels Flood Protection Project (Pre-Qualification) · closes Jan 20, 2027
Similar bids near San Jose
- Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East · San Jose · closes Dec 14, 2026
- Boeger Middle School Library Renovation — Lease-Leaseback Construction Services · San Jose · closes Dec 18, 2026
- Design Bid Build SCVMC Building M OR Renovation · San Jose · closes Jan 14, 2027
- Independent Living Home Habitability Improvements Project · San Jose · closes Jun 30, 2027
- San Jose City College ADA Flatwork Site Improvements Phase 2 · San Jose · closes Dec 4, 2026
Closing soon near San Jose
- Fire Alarm System Replacement at Sylvandale Middle School · San Jose · closes Dec 1, 2026
- Cal/OSHA Janitorial, Mailroom, and Facilities Training - Online Safety Program · San Jose · closes Dec 1, 2026
- Prequalification for Saint Louise Regional Hospital NPC 4/5 Seismic Compliance Project 263-CP25006-3 · San Jose · closes Dec 2, 2026
- PROGRESSIVE DESIGN-BUILD CP26011 RMC Seismic Compliance · San Jose · closes Dec 3, 2026
- Medical Gas Inspection, Certification, Preventative Maintenance and Minor Repair · San Jose · closes Dec 3, 2026