OpenRFPCloses Nov 30, 2026

Vegetation Removal at Butternut and Limestone Aqueducts, East Syracuse and Manlius, NY

New York Power Authority — Agriculture, Forestry, Gardening, Landscaping, Lawn Maintenance & Snow RemovalEast Syracuse, New York#K26-10391191CS-DP

Work includes clearing all vegetation within a 15-foot corridor on each side of the structures, including from cracks and joints in masonry and concrete. All cut material must be removed and disposed of at a licensed facility. Approved herbicide must be applied to prevent regrowth, with glyphosate prohibited. Erosion control and site restoration with topsoil, seed, and mulch are required. Coordination with New York State Parks and Trails is mandatory. Work must be completed within 90 days of permit issuance or by May 1, 2027, whichever is earlier. Proposals must include a lump-sum cost estimate for each site and labor must be paid at prevailing wage rates. Pre-bid site meetings are available by contacting Abbie Heinl.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Nov 30, 2026
Time stated in bid documents
Nov 30, 2026, 11:59 PM Eastern Time
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Documents analyzed
1

Scope of work

  • Remove all vegetation within 15 feet of Butternut and Limestone Aqueducts
  • Cut and remove trees, shrubs, vines, and saplings from masonry and concrete surfaces
  • Apply approved herbicide to cut stumps and cleared areas to prevent regrowth
  • Dispose of all debris at a licensed disposal or recycling facility
  • Restore disturbed areas with topsoil, seed, and mulch
  • Implement erosion and sediment control measures

Steps to Bid

  1. 1

    Register on NYPA’s Ariba platform (Official linkPro) to access the full bid package, including RFP, addenda, and related notices.

  2. 2

    Download the full RFP and scope of work documents from the NYPA Ariba network.

  3. 3

    Submit questions to the designated contact ([email available with Pro]) by the deadline specified in the RFP or any addenda.

  4. 4

    Attend a pre-bid site meeting (optional but encouraged) by contacting Abbie Heinl at (315) 345-7468 to coordinate.

What you'll need

Contract duration

90 days from issuance of NYSCC work permit or until May 1, 2027, whichever is earlier

Submission

Electronic portal

NAICS

561720

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The scope includes removal of all brush, shrubs, vines, saplings, and trees within a 15-foot horizontal corridor on each side of the aqueduct structures, including vegetation growing directly on or adjacent to the concrete and stone structures down to the water level. Work must be performed without damaging the structures. Debris must not be deposited in waterways or drainage channels. The contractor must restore disturbed areas with topsoil, seed, and mulch using approved fill. Coordination with New York State Parks and Trails is required for trail safety and potential closures. Pre-bid site meetings can be arranged with Abbie Heinl at (315) 345-7468. The Butternut Aqueduct is located at Butternut Drive, East Syracuse, NY. The Limestone Aqueduct is located in Manlius, NY.

Key dates

Bids due
Nov 30, 2026

Documents

  • K26-10391191CS-DP_-_Scope_of_work_vegetation_clearing_section_5.pdf14 pages

See all documents · Download with Pro

More from this agency

Similar bids near East Syracuse

Closing soon near East Syracuse