OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Walker County Resurfacing, Guardrail, Signal Upgrades, and Backplate Installation

Alabama Department of Transportation — ALDOTAlabama#STPAA-FMGR-HSIP-0195(509)

The Alabama Department of Transportation (ALDOT) is seeking bids for a highway project in Walker County. The project includes micro-milling, resurfacing, guardrail installation, traffic signal upgrades, and traffic stripe on SR-195. The project length is 5.643 miles. The tentative letting date is December 4, 2026. Bond is required.

On PublicBidSearch: the original bid posting and 2 bid documents for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Time stated in bid documents
Dec 4, 2026, 4:00 AM Central Time
Bid bond
Required
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Micro-milling, resurfacing (scrub seal), guardrail installation
  • Traffic signal upgrades (backplate installation and signal detection)
  • Traffic stripe application
  • Project on SR-195 from SR-5 in Jasper to 0.670 mile south of Browns Lane

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work type is Preventative Maintenance Level 1 (PM1). The F/A Project Number is STPAA-FMGR-HSIP-0195(509) and the ALDOT Project Number is 100080269. The contract time is 55 Working Days.

Key dates

Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • FutureLettings.pdf66 pages
  • PITEMS035.pdf2 pages

See all documents · Download with Pro