Washington Elementary School Improvements - Trade Package 1A General Trades
Rochester Public SchoolsMinnesota##121026 - 1A
Rochester Public Schools is seeking sealed bids for Trade Package 1A - General Trades in the Washington Elementary School Improvements project. Scope includes general construction work per Section 01 13 10, such as roofing replacement (20,043 sq ft), new insulated storefront windows, new lockers, floor finishes, and chiller replacement. Minnesota prevailing wage applies. Bids must be submitted via Euna Procurement.
On PublicBidSearch: the original bid posting and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Dec 10, 2026, 2:00 PM CT
- Time stated in bid documents
- Dec 10, 2026, 2:00 PM Central Time
- Submission
- electronic portal
Scope of work
- Replace 20,043 sq ft of low-slope roofing
- Provide and install new lockers
- Replace existing chiller system
Steps to Bid
- 1
Register on the Euna Procurement platform (Official linkPro) and access the opportunity using the reference number #121026 - 1A.
- 2
Review the project documents, including the final construction drawings and project manual, available via the BonfireHub portal.
- 3
Submit all required bid documents through the Euna Procurement portal by the due date and time. by Dec 10, 2026, 2:00 PM
What you'll need
Insurance
RequiredMinnesota prevailing wage applies.
Submission
Electronic portal
How to submit
Submit all bid documents through the Euna Procurement platform at Official linkPro. Bids must be received by 2:00 PM CT on December 10, 2026. Late submissions will not be accepted.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Rochester Public Schools (ISD #535) is soliciting sealed bids via the Euna Procurement eProcurement platform for Trade Package 1A - General Trades, part of the Washington Elementary School Improvements project. The overall project involves replacement of approximately 20,043 square feet of low-slope roofing, replacement of exterior window systems with new insulated storefront, installation of new lockers and floor finishes, and chiller replacement. Construction Manager: Knutson Construction Services. Architect: CRW Architecture + Design Group.
Key dates
- Questions due
- Dec 1, 2026, 3:00 PM Central Time
- Bids due
- Dec 10, 2026, 2:00 PM CT
More from this agency
- Fall School Photography and Student ID Services — closes Dec 1, 2026
- Best Value - Washington Elementary School Improvements - Trade Package 7A Roofing — closes Dec 10, 2026
- Washington Elementary School Improvements - Trade Package 8B Aluminum Systems and Glazing — closes Dec 10, 2026
- Washington Elementary School Improvements - Trade Package 22A Mechanical — closes Dec 10, 2026
- Washington Elementary School Improvements — closes Dec 10, 2026
Similar open bids
- Rebid Statewide Courier Services — Minnesota Department of Administration
- 40’ Container (1) ADA + (8) Door Privacy Restroom — Metropolitan Airports Commission
- Orono ES/IS Door Replacement — Independent School District #278
- Owatonna Education Center Addition and Alterations, Sitework — Owatonna Public Schools
Closing this week nearby
- Timber Retaining Wall with Culvert Construction at Camp Ripley Training Center, Little Falls, MN — closes Nov 23, 2026
- 100,000 Gallon Elevated Water Storage Tank — closes Nov 23, 2026
- Dry Dock Inspection, Repair, Hull Cleaning and Repainting of Up to Six Vessels — closes Nov 23, 2026
- MDVA CVSO North Spring Conference 2027 — closes Nov 23, 2026
- RFP for Mechanical Engineer to Design and Manage BAS System Upgrades at Faribault and Red Wing DOC Campuses — closes Nov 23, 2026