AZ Lakeside Office Sewer Line Replacement
Forest Service — USDA-FS, CSA EAST 11Lakeside, Arizona#12445127B0001
The U.S. Forest Service is soliciting bids for the replacement of the sanitary sewer service lateral at the Lakeside District Office in Lakeside, Arizona. The work includes excavation, installation of a new 4-inch minimum diameter sewer line (SDR-35 PVC or approved equivalent), connection to the PLSD public sewer main, surface restoration, and all required testing. Bidders must submit offers via email to [email available with Pro] with a subject line of '12445127B0001 QUESTION' for questions by November 30, 2026. The bid submission deadline is December 14, 2026, at 1300 CT. The contractor must begin work within 10 calendar days of receiving the notice to proceed and complete within 30 days. A bid guarantee is required. The contractor must comply with OSHA, ADEQ, PLSD, and other applicable standards. The offer must include SF-1442, acknowledgment of amendments, Schedule B, and a scanned copy of the bid guarantee.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 14, 2026
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- Contract term
- 30 days from the date of notice to proceed
- Documents analyzed
- 1
Scope of work
- Remove and replace the existing sanitary sewer service lateral at the US Forest Service Lakeside District office.
- Excavate, backfill, and restore all disturbed surfaces to pre-construction conditions.
- Perform all required testing, including low-pressure air test, hydrostatic test, mandrel testing, and CCTV inspection.
- Coordinate with PLSD staff for all connection and inspection activities.
Steps to Bid
- 1
Register in SAM and ensure active status.
- 2
Review the full solicitation package, including Attachments 001–004.
- 3
Attend the site visit on November 17, 2026, at 11:00 AM at the Lakeside Ranger District, 2022 W White Mountain Blvd, Lakeside, AZ 85929. was Nov 17, 2026, 11:00 AM
This date has passed — confirm eligibility with the agency before bidding.
- 4
Submit questions by email to [email available with Pro] and cc: [email available with Pro], with subject line '12445127B0001 QUESTION'. by Nov 30, 2026, 1:00 PM
- 5
Prepare and submit the offer via email to [email available with Pro] and cc: [email available with Pro].
What you'll need
Contract duration
30 calendar days from the date of notice to proceed
Submission
NAICS
237110
How to submit
All proposals must be emailed to [email available with Pro] and cc: [email available with Pro]. The subject line must read: 'SOLICITATION_12445127B0001'. Proposals must include: (1) SF-1442, Pages 1 and 2; (2) Acknowledgement of solicitation amendments; (3) Attachment 003 Schedule B Fillable; (4) Scanned copy of fully executed Bid Guarantee (Standard Form 24 and Power of Attorney).
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 5 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation number 12445127B0001 is issued as an Invitation for Bid (IFB) for Lakeside Office Sewer Line Replacement. All responsible sources may submit a quotation which will be considered by the agency.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 11:00 AM Arizona Time
- Site visit
- Nov 17, 2026, 11:00 AM Arizona Time
- Bids due
- Dec 14, 2026
Documents
- C04_12445127B0001_Complete_Package.pdf33 pages
More from this agency
- Coronado National Forest Range Program Fence Materials Purchase — closes Nov 23, 2026
- AZ Halfmoon Ranch House HVAC Installation - Ductless Split System Climate Control — closes Dec 7, 2026
- Forest Wide Decommissioning Project: Campground Demolition and Site Restoration in Tonto National Forest — closes Dec 7, 2026
- Bushy Knoll Pit Crush and Stockpile — closes Jan 6, 2027
Similar open bids
- Replace Wastewater Plant at South Rim Village — NATIONAL PARK SERVICE
- Replace the UV Disinfection System at the City of Bisbee Wastewater Treatment Plant — City of Bisbee
- Design/Build Services for Industrial Wastewater Treatment Facility — Town of Queen Creek
- Wastewater Utility Billing Methodology Study — Arizona Public Notice — statewide
- 10th Street Lift Station Expansion — City of Avondale
Closing this week nearby
- RFQ for Verde Commercial Tanks and Pump Station Project — closes Nov 23, 2026
- Entry Level Fire Fighter Exams — closes Nov 23, 2026
- Electric Motor Rewind, Repair, and Purchase Services — closes Nov 23, 2026
- Industry, Community & Business Partnership Opportunity for an Advance Technical Center (ATC) — closes Nov 23, 2026