Bushy Knoll Pit Crush and Stockpile
Forest Service — USDA-FS, CSA SOUTHWEST 7Happy Jack, Arizona#127EAX27Q0017
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 127EAX27Q0017 is issued as a Request for Quotation (RFQ) for Bushy Knoll Pit Crush & Stockpile. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 212321 Construction Sand and Gravel Mining. The small business size standard is 500 Employees. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. Statement of Requirement: Bushy Knoll Crush and Stockpile Project: This project will include mobilization, surveying, clearing and grubbing, drilling, material extraction through blasting or excavation, sampling and testing, stockpile surveying for quality control and crushing and stockpiling of aggregate material in accordance with the plans and specifications. It will also include the creation of an access road to gain access to the proposed work area. The Contractor shall be responsible to obtain all permits as required by Arizona Department of Environmental Quality (ADEQ) for the Contractor’s methods of operation(s). The Contractor shall furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. IAW 52.228-1 The amount of the bid guarantee shall be 20 percent of the bid price.
On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name and email) for this bid.
Contact
Agency contact for this bidName and email — included with ProProOverview
- Due
- Jan 6, 2027
- Bid bond
- 20%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- Contract term
- 180 calendar days from the Notice to Proceed
- Documents analyzed
- 7 published · 6 analyzed
Scope of work
- Mobilization and site preparation
- Clearing and grubbing of overburden
Steps to Bid
- 1
Review the solicitation documents, including the Statement of Work, Specifications, Schedule of Items, Fire Plan, Site Plan, and Wage Determination.
- 2
Attend the site visit on December 3, 2026, at 10:00 AM local time at the intersection of COC-211 and 211D. by Dec 3, 2026, 10:00 AM
- 3
Submit questions via email to [email available with Pro] by December 10, 2026, at 1:00 PM Central Time. by Dec 10, 2026, 1:00 PM
- 4
Prepare and submit a complete proposal via email to [email available with Pro] by January 6, 2027, at 1:00 PM Central Time.
What you'll need
Contract duration
180 calendar days from the Notice to Proceed
Submission
NAICS
212321
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Key dates
- Questions due
- Dec 10, 2026, 1:00 PM Arizona Time
- Pre-bid meeting
- Dec 3, 2026, 10:00 AM Arizona Time
- Bids due
- Jan 6, 2027
Documents
- 127EAX27Q0017_Bushy_Knoll_Pit_Crush_and_Stockpile.pdf16 pages
- Attachment_1_-_Statement_of_Work.pdf4 pages
- Attachment_2_-_Specifications.docx
- Attachment_3_-_Schedule_of_Items.xlsx
- Attachment_4_-_Fire_Plan.pdf6 pages
- Attachment_5_-_Site_Plan.pdf5 pages
- Attachment_6_-_Wage_Determination.pdf8 pages
More from this agency
- Forest Wide Decommissioning Project: Campground Demolition and Site Restoration in Tonto National Forest · closes Dec 7, 2026
- AZ Halfmoon Ranch House HVAC Installation - Ductless Split System Climate Control · closes Dec 7, 2026
- AZ Lakeside Office Sewer Line Replacement · closes Dec 14, 2026
Closing soon in Arizona
- Request for Proposals: Problem Gambling Mobile App for the Arizona Department of Gaming, Division of Problem Gambling · closes Nov 30, 2026
- 6670--Gravimetric Scales · closes Nov 30, 2026
- Problem Gambling App · closes Dec 1, 2026
- Improvements to Eloy Municipal Airport Drainage Improvements, Phase 3 · closes Dec 1, 2026
- Surge Arresters, 115 kV, Station Class, 76 kV MCOV, 96 kV Duty Cycle Voltage – Restock for WAPA DSW and UGP Regions · closes Dec 4, 2026