OpenRFPCloses Dec 7, 2026

Forest Wide Decommissioning Project: Campground Demolition and Site Restoration in Tonto National Forest

Forest Service — USDA-FS, CSA SOUTHWEST 7Roosevelt, Arizona#127EAX27Q0013

AMENDMENT 0001 - Extends Offer Due Date to December 7th, 2026 @1300 Central Time The Tonto National Forest is looking to achieve a more sustainable recreation program. Through this project, several recreation areas will be decommissioned in the Tonto Basin Ranger District (RD), and Globe RD. The decommission of campgrounds at the Tonto Bassin RD is the base bid and at Globe RD, it is an option bid. The intent of this work is to remove and safely dispose outside of the National Forest boundaries, recreational accommodations that include but not limited to Entry station buildings, toilets buildings, sidewalks, asphalt pavement, fish cleaning stations, septic system, and parking lots.

On PublicBidSearch: the original bid posting, 10 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 7, 2026

Key dates

Bids due
Dec 7, 2026

Documents

  • Sol_127EAX27Q0013_Amd_0001.pdf2 pages
  • C04_127EAX27Q0013_-_Forest_Wide_Campground_Decommissioning.pdf17 pages
  • C04_Attachment_1_-_Statement_of_Work.pdf9 pages
  • C04_Attachment_2_-_Schedule_of_Items.xlsx
  • C04_Attachment_3_-_Specifications.pdf
  • C04_Attachment_4_-_Directional_Maps.pdf4 pages
  • C04_Attachment_5_-_Google_Earth_Capture-maps.pdf5 pages
  • C04_Attachment_6_-_Indan_Point_Drawing.pdf

2 more files

See all documents · Download with Pro

More from this agency

Similar bids near Roosevelt

Closing soon near Roosevelt