OpenConstructionCloses Dec 30, 2026, 3:00 PM CT

Wetland Construction and Water Treatment System Using Solar-Powered Pump

Agriculture and Land StewardshipIowa#26-18 Sto842436B (Story)

This construction project involves building a wetland system to treat drainage district water using a solar-powered pump. Work includes earthwork (13,900 cubic yards), pipe installation (1,875 LF), riprap placement (20 tons), concrete structures (inlet, outlet, manhole, pump basin), solar pump system, and seeding of 27.3 acres. Construction must be completed by November 1, 2027, with seeding by December 15, 2027. The estimated cost is between $175,000 and $275,000. Bidders must be qualified to perform civil construction and wetland restoration work.

On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 30, 2026, 3:00 PM CT
Time stated in bid documents
Dec 30, 2026, 3:00 PM Central Time
Submission
electronic portal

Scope of work

  • Excavate and grade 13,900 cubic yards of earthwork
  • Install 1,875 linear feet of pipe and 20 tons of riprap
  • Build Modified SW-513 concrete inlet and outlet structures
  • Install modified SW401 concrete manhole and pump basin

Steps to Bid

  1. 1

    Register with the Iowa Bid Opportunities portal if not already registered.

  2. 2

    Review the full solicitation and all attached documents (if available) to understand scope, specifications, and submission requirements.

  3. 3

    Submit a bid response by the due date and time via the Iowa Bid Opportunities portal. by Dec 30, 2026, 3:00 PM

What you'll need

Submission

Electronic portal

NAICS

237190, 238290

How to submit

Submit via the Iowa Bid Opportunities portal at Official linkPro. Responses must be received by 3:00 PM CT on December 30, 2026. Late submissions will not be accepted.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 2 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project involves constructing a wetland to treat water from an existing drainage district tile and ditch using a solar panel-powered pump. Construction is scheduled to begin no later than November 1, 2027, with seeding to be completed by December 15, 2027, in accordance with specifications.

Key dates

Bids due
Dec 30, 2026, 3:00 PM CT

Documents

  • 9_Bid_Bond.pdf1 pages
  • 8_Proposal_-_Acknowledgement_-_Affidavit.pdf3 pages
  • 7_Schedule_of_Prices.pdf1 pages
  • 6_Design_Report.pdf133 pages
  • 5_Plans.pdf
  • 4_Specifications.pdf41 pages
  • 3_Bid_Book.pdf80 pages
  • 2_BID_BOOK.pdf

1 more file

See all documents · Download with Pro

More from this agency

Similar bids in Iowa

Closing soon in Iowa