Interior Glazing Subcontract for UCLA Acosta Operations Center
University of California, Los Angeles — Capital ProgramsLos Angeles, California#942403.01 (BP 04)
UCLA is soliciting bids from qualified Interior Glazing subcontractors for the Acosta Operations Center renovation at 410 Charles E. Young Drive West, Westwood, CA. The scope includes fire-rated window and sidelite glazing installation, fabrication, delivery, and full assembly. Work occurs in an occupied building with noise restrictions and may require night or weekend work. The successful bidder must hold a current California C-17 Glazing Contractor license. Bids must be submitted via BuildingConnected by November 6, 2026, at 12:00 PM PT. The estimated cost is $45,000.00. The project is subject to prevailing wage and labor code compliance.
Overview
- Due
- Nov 6, 2026
- Time stated in bid documents
- Nov 6, 2026, 12:00 PM Pacific Time
- Submission
- electronic portal
- Documents analyzed
- 4 published · 2 analyzed
- Required submission items
- 3 items · full checklist with Pro
Scope of work
- Install fire-rated window glazing in new technical operations center
- Install sidelite glazing in interior partitions and doors
- Fabricate, deliver, and fully assemble all glazing components
- Comply with LEED-ID+C certification requirements
- Perform work during restricted hours, including nights and weekends
Steps to Bid
What you'll need
Submission
Electronic portal
NAICS
238190
Get alerts for bids like this
New windows and glazing bids in California
This bid has closed. We'll tell you when the next one like it posts. Free, no card needed.
Get alerts — freeProject details
The University of California, Los Angeles (UCLA) is seeking sealed bids from qualified Interior Glazing subcontractors for the renovation of the Acosta Training Center at 410 Charles E. Young Drive West, Westwood, CA. The scope includes full assembly of windows and sidelites, including fabrication, delivery, installation, testing, labeling, touch-up, and closeout. The project is part of a larger renovation of 2,738 gross square feet at the ground floor of the Acosta Training Center, which includes demolition of six vacant offices (2,321 assignable square feet), new interior partitions, doors, flooring, ceilings, wall finishes, and modifications to mechanical, electrical, fire sprinkler, and fire alarm systems. The project requires compliance with LEED-ID+C minimum certification, hazmat abatement, and night/weekend work to minimize disruption.
Documents
- 942403-01a_AdforBids_BP04_.pdf4 pages
- 942403-01b_AdforBids_BP04_.pdf
- 942403-01c_AdforBids_BP04_.pdf
- 942403-01d_AdforBids_BP04_.pdf3 pages
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- SMUMC Room 3411 Interventional Radiology Equipment Replacement — closes Nov 10, 2026
- Gayley Center Real Time Safety Center (PREQUALIFICATION) — closes Nov 12, 2026
- UWVMC 2nd Floor Sterilizer Replacement — closes Nov 17, 2026
- Window Treatment/Overhead Curtain Installation for UCLA RRUMC 4th Floor Patient Care Reconfiguration — closes Nov 30, 2026
- Doors, Frames, and Hardware Subcontract for RRUMC 4th Floor Patient Care Reconfiguration — closes Nov 30, 2026
Similar open bids
- Yuba College, Automatic Door Opening and Closing, Door Hardware Improvements-Second Solicitation — Yuba Community College District
- Supply and Delivery of 9 Complete Fire Escape Door Assemblies for FCC Lompoc Correctional Facility — FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
- RRUMC 4th Floor Patient Care Reconfiguration – Glass & Glazing Subcontract — University of California, Los Angeles
- On-Call Door and Gate Maintenance and Repair Services — City of Ontario
- Moorpark College Student Service Annex Exterior Door Replacement — Ventura County Community College District
Closing this week nearby
- Special Events Coordinator — closes Nov 9, 2026
- Third Party Collection Services Extension — closes Nov 9, 2026
- Ice Machine Maintenance & Repair and Freon Extraction — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation — closes Nov 9, 2026
- Meadows Parkway Pavement Rehabilitation Project No. PW25-07 — closes Nov 9, 2026