Construction or Improvement of Electrical Facilities: Overhead and Underground Line Work — City of Washougal, Evergreen Way & 32nd St
Clark Public UtilitiesWashington
Scope includes 11 transmission poles, 10 distribution poles, 3 pole-mounted switches, 2,000 ft of 795 AAC wire, 2,200 ft of 397 AAC wire with 2/0 neutral, 120 ft of 1000MCM AL primary conductor, and other electrical infrastructure. Bids must be submitted electronically via ProcureWare or delivered in sealed form to the Ed Fischer Operations Center in Vancouver, WA, by 11:00 AM PT on December 8, 2026. Only prequalified contractors may bid. A 5% bid guaranty is required. Questions may be directed to Cathy Wannamaker, Materials Manager.
On PublicBidSearch: the newspaper notice and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 8, 2026
- Time stated in bid documents
- Dec 8, 2026, 11:00 AM Pacific Time
- Bid bond
- 5%
- Submission
- electronic portal, hand delivery, courier
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Install 11 transmission poles with underbuild
- Install 10 distribution poles and framing
Steps to Bid
- 1
Register on ProcureWare
Bidders must register at [link available with Pro] under the 'Supplemental Application Public' category to access bid documents.
- 2
Obtain bid documents
Bid documents, including plans and specifications, are available through the ProcureWare portal.
- 3
Submit questions by deadline
Questions must be submitted prior to the bid deadline. Contact Cathy Wannamaker at [email available with Pro] or (360) 992-8834.
- 4
Prepare and submit bid
Bids must be submitted electronically via ProcureWare (Response tab) or delivered in sealed form to the Ed Fischer Operations Center, 8600 NE 117th Ave, Vancouver, WA 98662, via courier or hand delivery only. No postal mail accepted.
- 5
Include bid guaranty
Each bid must be accompanied by a bid guaranty: a surety bond or certified/cashier’s check in an amount not less than 5% of the total bid value (including additives and alternates, excluding sales tax).
What you'll need
Prequalification
RequiredSubmission
Electronic portal, Hand delivery, Courier
NAICS
237130, 237131
How to submit
Bids must be submitted electronically via ProcureWare (Response tab) or delivered in sealed form via courier or hand delivery. No U.S. Postal Service deliveries accepted.
In person/mail: Clark Public Utilities, Purchasing Department, Ed Fischer Operations Center Building, 8600 NE 117th Avenue, Vancouver, WA 98662
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The project includes overhead work: installation of 11 transmission poles with distribution underbuild, 10 distribution poles and framing, 3 pole-mounted distribution switches, 3 guy stub poles, 26 anchors, 2,000 circuit feet of (3) 795 AAC wire, 2,200 circuit feet of (3) 397 AAC wire with 1 × 2/0 neutral, 100 conductor feet of 2/0 ACSR, 200 linear feet of single-phase #2 ACSR, 470 conductor feet of #6 duplex, 13 span guys, 13 spans of secondary conductor, 5 single-phase transformers, 1 three-phase bank of transformers, and removal or transfer of existing facilities, including top/abandonment of distribution and transmission poles per design. Underground work includes trenching and/or boring in the City of Washougal right-of-way, installation of conduits, and installation and energization of approximately 120 linear feet of (3) jacketed 1000MCM AL primary conductor, 245 linear feet of (3) 1/0 AL primary conductor, 190 linear feet of (1) jacketed 1/0 AL primary conductor, 275 linear feet of conduit for fiber optics, risers, junction boxes, secondary pedestals, secondary conduits, fiber vaults, and other work as described in the Summary of Work. No U.S. Postal Service deliveries are accepted. Bids must be received no later than 11:00 A.M. Pacific Time on Tuesday, December 8, 2026. A bid guaranty in the form of a surety bond or certified/cashier’s check in an amount not less than 5% of the total bid value (including additives and alternates, excluding sales tax) must accompany each bid. Bids received after the deadline will not be accepted. The bid opening will be public and may be accessed by calling 1-866-951-1151 with Conference ID 335-968-365.
Key dates
- Bids due
- Dec 8, 2026
More from this agency
- Interior Blast and Recoating of RRGP Raw Water Storage Tank · closes Dec 10, 2026
- Interior Blast and Recoating of RRGP Raw Water Storage Tank · closes Dec 10, 2026
- Water Main Replacement on NW 94th Street, Clark Public Utilities Bid 734 · closes Dec 11, 2026
- Water Main Replacement: NW 94th St · closes Dec 11, 2026
- AMI-Enabled Water Meters · closes Dec 22, 2026
Similar bids in Washington
- Uninterruptable Power Supplies · closes Dec 16, 2026
- Cape Horn Substation Upgrades Project · closes Dec 15, 2026
- Invitation for Bids: 115 kV/12.47 kV, 15/20/25/28 MVA Power Transformer for Jorstad Substation · closes Jan 20, 2027
- Lift Station 1 Improvements Project · closes Dec 15, 2026
- UPS Maintenance and Repair Services for 39 Units Across Washington State · closes Dec 12, 2026
Closing soon in Washington
- Learning Management System (LMS) Procurement for the Administrative Office of the Courts · closes Dec 1, 2026
- Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center · closes Dec 2, 2026
- Monroe Hall CEI Phase 1 Construction — Edmonds College · closes Dec 3, 2026
- Request for Qualifications: Professional Engineering Services for Wastewater Planning Project with Option for Design… · closes Dec 4, 2026
- Pharmacy Inventory Management System Solicitation · closes Dec 5, 2026