Building 141 Generator Replacement
Dept of the Navy — NAVFACSYSCOM MID-ATLANTICGroton, Connecticut#AMS00803446
This project involves the demolition and replacement of a generator at Building 141, Naval Submarine Base New London, Groton, CT. The scope includes modifying electrical distribution equipment, ancillary equipment, and an automatic transfer switch. A portable generator is required during construction. Bidders must be listed on the NEWPORT/NEW LONDON ML-C00073 MACC to bid. The estimated project range is $500,000 to $1,000,000. The time for completion is 180 calendar days after contract award. General Decision Number CT202600024 MOD 02 dated 05/18/2026 is applicable for wages. Proposals must be emailed by Tuesday, December 15, 2026, at 2:00 PM EST. The award will be based on the lowest evaluated price.
Overview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Eastern Time
- Bid bond
- 20%
- Submission
- Documents analyzed
- 14 published · 8 analyzed
Scope of work
- Demolish and replace existing generator.
- Provide a portable trailer-mounted generator during construction.
Steps to Bid
- 1
Submit visitor requests for the site visit by November 13, 2026, 9:30 AM EST. by Nov 13, 2026, 9:30 AM
- 2
Attend the site visit on Monday, November 16, 2026, at 10:30 PM EST. by Nov 16, 2026, 10:30 PM
- 3
Submit RFIs in writing by email by 5:00 PM EST on November 30, 2026. by Nov 30, 2026, 5:00 PM
- 4
Submit proposals via email by Tuesday, December 15, 2026, at 2:00 PM EST. by Dec 15, 2026, 2:00 PM
What you'll need
Bid security
RequiredThe amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000 whichever is less.
Contract duration
180 calendar days after contract award
Award method
The proposed Task Order will be awarded to the lowest evaluated price.
Submission
NAICS
236220
How to submit
Proposals must be emailed to [email available with Pro]
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 10 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
Performance is to take place at Naval Submarine Base New London in Groton, CT. The contractor will be responsible for permitting, fuel tank, and refueling during construction activities. Building 141 is of significant historical importance and is eligible for listing on the National Register of Historic Places. The exact location will be shown by the Contracting Officer. Occupancy notifications will be posted in a prominent location in the work area. Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
Key dates
- Questions due
- Nov 30, 2026, 5:00 PM Eastern Time
- Site visit
- Nov 16, 2026, 10:30 PM Eastern Time
- Bids due
- Dec 15, 2026
Documents
- RFP_ASM00803446.pdf6 pages
- 28A_29_Groton_B._141_-_Specifications_-_Final.pdf539 pages
- 28B_29_Groton_B._141_Generator_Drawings_281_29.pdf
- 28C_29_CT_Wage_Determination.pdf6 pages
- 28D_29_ECMS.pdf9 pages
- 28E_29_CERT-141.pdf2 pages
- 28F_29_Guide_to_Taxes.pdf86 pages
- 28G_29_Sales_Tax_Exempt.pdf11 pages
6 more files
Contact
Agency contact for this bidName, email & phone — included with ProProMore from this agency
- Rental of 400 CFM Low Pressure Air Compressor System — closes Nov 9, 2026
- Rental of High-Pressure Nitrogen Gas Tube Trailer – Naval Base New London, Groton, CT — closes Nov 12, 2026
- VH-92A FY28 Spare Parts — closes Nov 16, 2026
- Weapons Shipping Harness Refurbishment Blanket Purchase Agreement — closes Dec 3, 2026
- Building 434 Roof Repair — closes Dec 21, 2026
Similar open bids
- Prequalification: E Building Heat Pipe Replacement — UConn Health Center
- Evansville Well Rehabilitation — Meriden, City of
- Platt & Lincoln Wells Rehabilitation — Meriden, City of
- Birth to Three System Request for Proposals (RFP) — Early Childhood, Office of
- Energy Resilience Construction Grants — Energy & Environmental Protection
Closing this week nearby
- Modernization Consulting and Grant Application and Administration Services — closes Nov 9, 2026
- Replacement of Bridge No. 05350 Bosworth Road over Mashamoquet Brook — closes Nov 9, 2026
- Prospect Police Department Furnace Replacement — closes Nov 9, 2026
- Fire Hydrant Installation and Water Main Wet Cuts – RFP No. SNEW-WD-2026-001 — closes Nov 9, 2026