Citrus Glen Elementary School Roofing Replacement
Ventura Unified School DistrictCalifornia#E13-26
Ventura Unified School District seeks bids for the Citrus Glen Elementary School Roofing Replacement project (Bid No. E13-26). The scope includes removing the existing roof, repairing the deck, installing new underlayment, shingles, gutters, downspouts, and coping. The District will supply some roofing materials. A mandatory pre-bid conference is scheduled for December 8, 2026. The contract duration is 60 days.
On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Jan 22, 2027
- Time stated in bid documents
- Jan 22, 2027, 11:00 AM Pacific Time
- Submission
- electronic portal
- Contract term
- 60 days
- Documents analyzed
- 8 published · 7 analyzed
Scope of work
- Remove existing roofing system down to the wood deck.
- Repair any damage to the wood deck.
- Install two plies of R-Mer Seal Underlayment.
- Install GAF Reflector Series lifetime dimensional shingles.
- Replace non-mechanical vents, breathers, heat stacks, and penetration flashings.
Steps to Bid
- 1
Attend the mandatory Pre-Bid Conference. by Dec 8, 2026, 8:30 AM
There will be a mandatory Pre-Bid Conference on December 8, 2026 at 8:30 A.M. Starting at Citrus Glen Elementary School 9655 Darling Rd., Ventura, CA 93004. Any Contractor bidding on the Project who fails to attend the entire mandatory job walk and conference will be deemed a non-responsive bidder and will have its bid returned unopened.
- 2
Submit bid electronically via the Secure Bids Vendor portal. by Jan 22, 2027, 11:00 AM
All Bid Proposals must be submitted electronically via the District’s Secure Bids Vendor portal, on or before the time and date stated above, at which time they will be publicly opened and read aloud.
What you'll need
Contract duration
60 days
Award method
The Contract will be awarded to the lowest responsive responsible bidder by action of the governing Board.
Submission
Electronic portal
How to submit
All Bid Proposals must be submitted electronically via the District’s Secure Bids Vendor portal, on or before the time and date stated above, at which time they will be publicly opened and read aloud. Any bids received after the time specified above or after any extensions due to material changes shall be returned unopened.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
Cancel anytime · no card to browse
Project details
The District will procure and provide certain roofing materials through the CMAS program for installation by the contractor. Bids must be submitted electronically via the District's Secure Bids Vendor portal by January 22, 2027, at 11:00 AM PT.
Key dates
- Questions due
- Dec 13, 2026
- Pre-bid meeting
- Dec 8, 2026, 8:30 AM Pacific Time · Mandatory
- Bids due
- Jan 22, 2027
Documents
- VUSD_CITRUS_GLEN_2027_ROOFING_SPEC_11.24.pdf25 pages
- E13-26_VC_Star_Notice_Inviting_Bid.pdf4 pages
- E13-26_Citrus_Glen_Roofing_Project_Manual.pdf228 pages
- Citrus_Glen-9655_Darling_Road_COMBINED_Asbestos_Full_Report_10-28-26_.pdf130 pages
- Citrus_Glen_ES_Protocol_for_Paint_Stabilization.pdf4 pages
- Citrus_Glen_ES_Asbestos_Contaning_Black_Penetration_Mastic_Removal_Protocol.pdf3 pages
- Citrus_Glen_Elementary_School_Roof_Lead_Full_Report_10-28-26_.pdf16 pages
- Citrus_Glen_11.17.pdf
More from this agency
- Junipero Serra Elementary School Roofing Replacement · closes Jan 22, 2027
- Mound Elementary School Roofing Replacement · closes Jan 22, 2027
- Sunset School Roofing Replacement · closes Jan 22, 2027
Similar bids in California
- Roof Maintenance Services - IFB 27C509000 · closes Dec 8, 2026
- Archie Williams High School Roofing & HVAC Project – Subcontractor Bids · closes Dec 17, 2026
- Roof Maintenance Services - IFB 27C535000 · closes Dec 10, 2026
- Roof Replacement for Facility 118-309A-RS, Department of Corrections & Rehabilitation · closes Dec 17, 2026
- Roof Maintenance Services - IFB 27C550000 · closes Dec 15, 2026
Closing soon in California
- Project 13751. FTB EVSE. Contract 26-340236 · closes Nov 30, 2026
- Preassembled Glock Firearms and Accessories Kits · closes Nov 30, 2026
- Crane Rental with Operator, Oiler, and Rigger/Signal Person Services · closes Dec 1, 2026
- Biopsychosocial Rehabilitation Wellness Recovery Centers · closes Dec 1, 2026
- Railroad Street Improvements from Azusa Avenue to Fullerton Road, City of Industry · closes Dec 3, 2026