OpenConstructionCloses Jan 22, 2027

Junipero Serra Elementary School Roofing Replacement

Ventura Unified School DistrictCalifornia#E22-26 REBID

This solicitation is for the Junipero Serra Elementary School Roofing Replacement project by Ventura Unified School District. The scope includes replacing the low-slope roof with a KEE-Stone system and restoring the metal roof with a Cool-Sil system. A mandatory pre-bid conference is scheduled for December 8, 2026. The contract duration is 60 days.

On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Jan 22, 2027
Time stated in bid documents
Jan 22, 2027, 12:00 PM Pacific Time
Submission
electronic portal
Contract term
60 days
Documents analyzed
8

Scope of work

  • Replace all drip edge conditions with new Solarbrite KEE clad metal.
  • Replace all curbs to meet a minimum of 6-8” height.
  • Replace all gutters with new 22GA flat sheet and install new 3” min schedule 30 steel pipe downspouts.

Steps to Bid

  1. 1

    Submit a Prequalification Application at Official linkPro at least ten (10) business days prior to the last date for bid submission.

  2. 2

    Attend the mandatory Pre-Bid Conference. by Dec 8, 2026, 10:00 AM

  3. 3

    Submit bids electronically via the District’s Secure Bids Vendor portal. by Jan 22, 2027, 12:00 PM

What you'll need

Prequalification

Required

Contract duration

60 days

Submission

Electronic portal

How to submit

All Bid Proposals must be submitted electronically via the District’s Secure Bids Vendor portal.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 5 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Ventura Unified School District is soliciting bids for the "Junipero Serra Roofing Replacement" project, identified by bid number E22-26 REBID. Bids are to be submitted electronically via the District's Secure Bids Vendor portal by January 22, 2027, at 12:00 P.M. Pacific Time.

Key dates

Pre-bid meeting
Dec 8, 2026, 10:00 AM Pacific Time · Mandatory
Bids due
Jan 22, 2027

Documents

  • VUSD_JUNIPERO_SERRA_2027_SPEC_11.24.pdf28 pages
  • Ventura_Unified_SD_JUNIPERO_SERRA.pdf9 pages
  • Junipero_Serra_Elementary_School-8880_Halifax_Street_Lead_Full_Report_Roofin.pdf17 pages
  • Junipero_Serra_Elementary_School-8880_Halifax_Street_Asbestos_Full_Report_Ro.pdf56 pages
  • Junipero_Serra_Elementary_School_Protocol_for_Paint_Stabilization_Approved.pdf4 pages
  • Junipero_Serra_Elementary_School_Asbestos_Roofing_Mastic_Removal_Protocol_-_.pdf3 pages
  • E22-26_REBID_Junipero_Serra_-_Project_Manual.pdf228 pages
  • E22-26_REBID_JSerra_-_VC_Star_NIB.pdf4 pages

See all documents · Download with Pro

More from this agency

Similar bids in California

Closing soon in California