OpenConstructionCloses Jan 22, 2027

Sunset School Roofing Replacement

Ventura Unified School DistrictCalifornia#E23-26 REBID

E23-26 REBID). Bids are due January 22, 2027, at 2:00 P.M. A mandatory pre-bid conference is scheduled for December 8, 2026.

On PublicBidSearch: the original bid posting, 8 bid documents and the agency contact (name and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and phone — included with ProPro

Overview

Due
Jan 22, 2027
Time stated in bid documents
Jan 22, 2027, 2:00 PM Pacific Time
Submission
electronic portal
Contract term
60 days
Documents analyzed
8 published · 7 analyzed

Scope of work

  • Remove existing roofing system down to the wood deck.
  • Repair all deficiencies in wood deck and fascia.
  • Install R-Mer Seal Underlayment and R-Mer Shield roof panels.
  • Replace rooftop vents, breathers, heat stacks, and flashings.
  • Install KEE-Stone FB 60 cold applied 2-ply thermoplastic hybrid roof system.
  • Replace all coping on walls with 22GA R-Mer Edge coping.

Steps to Bid

  1. 1

    Attend the mandatory Pre-Bid Conference. by Dec 8, 2026, 1:00 PM

    Starting at Sunset School, 400 Sunset Ave, Oak View, CA 93022.

What you'll need

Contract duration

60 days

Submission

Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

A mandatory pre-bid conference will be held on December 8, 2026, at 1:00 P.M. at Sunset School.

Key dates

Pre-bid meeting
Dec 8, 2026, 1:00 PM Pacific Time · Mandatory
Bids due
Jan 22, 2027

Documents

  • VUSD_SUNSET_2027_SPEC_11.24_Rev.pdf26 pages
  • Ventura_Unified_SD_SUNSET_Plans.pdf
  • Sunset_Elementary_School-400_Sunset_Avenue_Lead_Full_Report_Roofing_Project_.pdf18 pages
  • Sunset_Elementary_School-400_Sunset_Avenue_Asbestos_Full_Report_Roofing_Proj.pdf42 pages
  • Sunset_Elementary_School_Protocol_for_Paint_Stabilization_Approved.pdf4 pages
  • Sunset_Elementary_School_Asbestos_Roofing_Mastic_Removal_Protocol_-_Approved.pdf3 pages
  • E23-26_Sunset_School_-_VC_Star_NIB.pdf4 pages
  • E23-23_REBID_Sunset_School_Roofing_Replacement_-_Project_Manual.pdf229 pages

See all documents · Download with Pro

More from this agency

Similar bids in California

Closing soon in California