Prefabricated Fiber-Reinforced Polymer (FRP) Trail Bridge for Elkhorn Trail

Forest Service — USDA-FS, CSA INTERMOUNTAIN 4Colorado#1240LP27Q0002

This solicitation seeks quotes for the design, fabrication, and delivery of one 85-foot single-span prefabricated fiber-reinforced polymer (FRP) trail bridge for the Elkhorn Trail crossing of the Little Snake River in Colorado. The acquisition is a total small business set-aside. The NAICS code is 326199. The bridge must be designed by a licensed Colorado engineer and meet specific technical requirements, including a minimum 5-foot clear width and a 15-year warranty. Delivery is required between May 15 and June 30, 2027, to the Columbine Parking Area. The Forest Service will install the bridge. Quotes are due by December 7, 2026, at 4:00 PM MT. Questions are due by November 30, 2026, at 4:00 PM MT.

On PublicBidSearch: the original bid posting, 7 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Dec 7, 2026
Time stated in bid documents
Dec 7, 2026, 4:00 PM Mountain Time
Submission
email
Documents analyzed
7 published · 5 analyzed

Scope of work

  • Design, fabricate, and deliver one 85-ft FRP trail bridge
  • Delivery to Columbine Parking Area, Clark, CO

Steps to Bid

What you'll need

Award method

Award will be made to the lowest-priced, technically acceptable offeror. No tradeoffs will be conducted.

Submission

Email

NAICS

326199

How to submit

Quotes shall be submitted electronically to: [email available with Pro]

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

This is a combined synopsis/solicitation for commercial items prepared in accordance with FAR Part 12. The bridge will be an 85-foot single-span, 5-foot clear width, half-through (side) truss design, including FRP grade beams, for pedestrian, bicycle, ATV, and pack and saddle use at the Elkhorn Trail crossing of the Little Snake River. The design must be stamped by a professional engineer licensed in Colorado and approved by the USDA Forest Service. The supplier shall deliver, unload, and stack all components at the Columbine Parking Area near Hahns Peak Village, Colorado. The bridge superstructure shall be FRP; steel superstructure options do not apply. Precast concrete grade beams, backwalls, timber backing planks, and other substructure components are not required. Installation, demolition, site work, staging at the installation site, and helicopter transportation are not part of this order. A manufacturer's representative on site during installation is not required. The supplier shall unload, stack, support, and block all components at the delivery point. Deliveries are to be made between May 15, 2027, and June 30, 2027, weather dependent. The supplier shall provide assembly drawings and a recommended assembly procedure. FAR 52.225-1, Buy American—Supplies, governs the origin of end products. The warranty period begins on the date the Government accepts the delivered bridge components and is for a minimum of fifteen (15) years. The deck may be treated timber or FRP deck planks; recycled-plastic deck planks are not permitted. A wearing surface of 3-inch by 8-inch minimum rough-sawn Douglas fir-larch running planks, at least 56 inches wide, is required. Timber shall be treated to AWPA Use Category UC4C. The design snow load is 200 psf. The supplier shall package components on pallets or skids weighing between 1,000 and 1,500 pounds each, protected from the weather, and readily unloaded and stockpiled. Any component that cannot be packaged within that weight range shall be identified and coordinated with the COR before shipment. Components must be coordinated with the COR before fabrication. The supplier is not required to coordinate helicopter transport. Forest-bridge overload permits do not apply. The bridge color shall be approved by Forest Service leadership. Final design drawings and calculations will be stamped by a professional engineer licensed in Colorado. The manufacturer must have a minimum of five (5) years of experience designing and fabricating FRP trail bridge systems, with at least five (5) successful FRP bridge projects in service for at least three (3) years. ISO 9001:2015 accreditation is required. The bridge shall be designed for a 90 psf pedestrian live load, a 200 psf snow load, and a 50-inch, 1,000-lb ATV. Railings must be at least 54 inches above the deck. The warranty must be at least fifteen (15) years.

Key dates

Questions due
Nov 30, 2026, 4:00 PM Mountain Time
Bids due
Dec 7, 2026

Documents

  • 1240LP27Q0002_-_Elkhorn_Trail_Bridge.pdf12 pages
  • Attachment_1_-_Statement_of_Work_-_Elkhorn_Trail_Bridge_2810_Pages_29.pdf10 pages
  • Attachment_2_-_Vicinity_Map_-_Elkhorn_Trail_Bridge_Project_281_Page_29.pdf1 pages
  • Attachment_3_-_Elkhorn_Trail_Bridge_Plans_288_Pages_29.pdf
  • Attachment_4_-_Elkhorn_Trail_Bridge_Project_Specifications_2829_Pages_29.pdf29 pages
  • Attachment_5_-_ASCE_Design_Hazards_Report_288_Pages_29.pdf
  • Attachment_6_-_Trail_Management_Objectives_28TMOs_29_-_Elkhorn_Trail_1149.1_.pdf8 pages