Safety Widening, Planing, Resurfacing (Scrub Seal), Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe on SR-8 (US-80) from Marengo County Line to Dallas County Line, Perry County, Alabama
Alabama Department of TransportationAlabama#NH-HSIP-FMGR-0008
The Alabama Department of Transportation is soliciting sealed bids for the construction of safety widening, planing, resurfacing (scrub seal), bridge guardrail retrofit, guardrail installation, and traffic stripe on SR-8 (US-80) from the Marengo County Line to the Dallas County Line in Perry County, Alabama. Bids must be submitted by 10:00 AM on December 4, 2026, at the Alabama Department of Transportation in Montgomery. A bid bond of 5% of the bid amount (up to $50,000) is required. Plans and proposals are available for purchase at $13.00 and $5.00 per set, respectively. The project is subject to federal safety and wage standards. The bracket estimate is $4,594,606 to $5,615,630, but this is not used in bid evaluation.
On PublicBidSearch: the newspaper notice for this bid.
Overview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- mail, hand delivery
- Required submission items
- 2 items · full checklist with Pro
Scope of work
- Resurface 6.144 miles of SR-8 (US-80) with scrub seal
- Apply traffic stripe and markings on SR-8
Steps to Bid
- 1
Obtain the bid proposal and plans from the Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110.
- 2
Purchase the bid proposal for $5.00 and plans for $13.00 per set. Checks must be made payable to the Alabama Department of Transportation.
- 3
Prepare and submit a sealed bid with a bid bond of 5% of the bid amount (maximum $50,000.00) or a cashier's check payable to the Alabama Department of Transportation. by Dec 4, 2026, 10:00 AM
- 4
Submit the bid in person or by mail to the Director of Transportation, Alabama Department of Transportation, Montgomery, Alabama, by 10:00 AM on December 4, 2026. by Dec 4, 2026, 10:00 AM
What you'll need
Insurance
RequiredThis project is subject to the Contract Work Hours and Safety Standards Act and its implementing regulations.
Submission
Mail, Hand delivery
NAICS
237130, 237199
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 3 watch-outs that disqualify bidders
- The 2-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Sealed bids will be publicly opened at the time of receipt. A bidding proposal may be purchased for $5.00. All materials must conform to the advertised specifications. The project is subject to the Contract Work Hours and Safety Standards Act and its implementing regulations. Minimum wage rates are pre-determined by the Secretary of Labor and included in the specifications. A bid bond of 5% of the bid amount (maximum $50,000.00) or a cashier's check payable to the Alabama Department of Transportation must accompany each bid. This bracket is for informational purposes only and should not be used in bid preparation. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate.
Key dates
- Bids due
- Dec 4, 2026, 10:00 AM CT
More from this agency
- Micro-Milling, Resurfacing (Scrub Seal), Guardrail Installation, Traffic Signal Upgrades, and Traffic Stripe on SR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing, Guardrail Installation (Steel Blockout Replacement), and Traffic Stripe on SR-59 from CR… · closes Dec 4, 2026
- Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II and Type III), and Traffic Stripe on SR-1 (US-431) from… · closes Dec 4, 2026
- Federal Aid Project No. STPAA-HSIP-0021(591) — Resurfacing and Traffic Stripe Work on SR-21, Wilcox County, Alabama · closes Dec 4, 2026
- Federal Aid Project No. NH-FMGR-0001(659) & ATRP2-48-2025-252 — Marshall County, Alabama · closes Dec 4, 2026
Similar bids in Alabama
- Micro-Milling, Resurfacing (Scrub Seal), Patching, Guardrail Installation, and Traffic Stripe on SR-25 from SR-3 (US… · closes Dec 4, 2026
- One 40-Yard Dumpster Supply and Delivery at Fort Graves / Talladega National Guard Armory · closes Dec 3, 2026
- Pickens County — Resurfacing, Guardrail, and Guardrail End Anchors on SR-6 (US-82) · closes Dec 4, 2026
- Gun Safes and Safe Dehumidifiers · closes Nov 30, 2026
- AIDT/HQ Unarmed Security Guard Services · closes Dec 1, 2026
Closing soon in Alabama
- RFP for 2025–2035 Statewide Historic Preservation Plan, Alabama Historical Commission · closes Nov 30, 2026
- Fairhope Middle School Boiler Replacement · closes Dec 3, 2026
- HVAC Maintenance, Repair, and Tune-Up for State Cattle Ranch and Field Trial Area · closes Dec 3, 2026
- Resurfacing and Traffic Stripe on CR-77 from CR-22 to SR-74 (US-278) Southeast of Addison, Winston County, Alabama · closes Dec 4, 2026
- Construction of Pre-Manufactured Terminal Building at Carl Folsom Airport · closes Dec 4, 2026