OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Pickens County — Resurfacing, Guardrail, and Guardrail End Anchors on SR-6 (US-82)

Alabama Department of Transportation — ALDOTAlabama#NH-FMGR-0006(610)

This is a construction project for Pickens County, Alabama, involving resurfacing, guardrail, and guardrail end anchors on SR-6 (US-82) for a length of 5.00 miles. The estimated value is $4,519,783.50, with a contract time of 100 working days. The tentative letting date is December 04, 2026. A mandatory pre-bid meeting is scheduled for November 20, 2026, at 9:00 AM CT. A bid bond is required.

On PublicBidSearch: the original bid posting and 2 bid documents for this bid.

Open Original Bid Source Pro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Time stated in bid documents
Dec 4, 2026, 4:00 AM Central Time
Documents analyzed
2 published · 1 analyzed

Scope of work

  • Resurfacing on SR-6 (US-82) from Mississippi State Line to Bradshaw Road
  • Guardrail installation

Steps to Bid

  1. 1

    Attend mandatory pre-bid meeting. was Nov 20, 2026, 9:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

    The pre-bid meeting is mandatory.

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 3 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The work type is (PM2) PREVENTATIVE MAINTENANCE LEVEL 2. The F/A Project Number is NH-FMGR-0006(610), and the ALDOT Project Number is 100081940.

Key dates

Pre-bid meeting
Nov 20, 2026, 9:00 AM Central Time · Mandatory
Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • FutureLettings.pdf66 pages
  • PITEMS022.pdf2 pages

See all documents · Download with Pro

More from this agency

Similar bids in Alabama

Closing soon in Alabama