OpenRFPCloses Jan 8, 2027

Fire Alarm Control Panel Replacement Project

Department of Energy — BERKELEY NATL LAB - DOE CONTRACTORCalifornia#2026-PTG-FACPR

The University of California, Lawrence Berkeley National Laboratory requests proposals for design-build services for the design and construction of the Fire Alarm Control Panel Replacement Project ("FACPR" or "the Project"). The Project covers Buildings 2, 26, 33, and 76. Under this subcontract, the Design-Build Subcontractor will provide all professional design, engineering, procurement, installation, changeover, and commissioning services needed to replace the fire alarm control panels and backup battery systems. The Siemens Desigo system has been selected as LBNL's campus-standard fire alarm platform for this Project, no substitutions will be considered. Using one common platform supports compatibility with the existing mix of field devices, loops, and conventional circuits, and simplifies maintenance, training, and future parts availability across the site. The existing fire alarm wiring in the four buildings will generally remain in place. This Project replaces the central control equipment, not the complete building fire alarm systems. Fire alarm annunciation and notification devices and the StarLink cabinets themselves are not being replaced under this Project; StarLink cabinets will be relocated only as needed to follow the panels.

On PublicBidSearch: the original bid posting, 9 bid documents and the agency contact (name and email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName and email — included with ProPro

Overview

Due
Jan 8, 2027
Performance bond
100%
Payment bond
100%
Submission
email, electronic portal
Contract term
The anticipated period of performance begins at subcontract award and continues through March 7, 2028 for the four buildings.
Documents analyzed
9

Scope of work

  • Utilize Siemens Desigo system; no substitutions allowed.
  • Coordinate fire alarm outages with LBNL-provided fire watch.
  • Test, commission, and document systems per LBNL Fire Marshal and Facilities Engineering requirements.

Steps to Bid

What you'll need

Contract duration

March 7, 2028

Submission

Email, Electronic portal

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The project requires PE-stamped design packages at 50%, 75%, 95%, and 100% completion for review and approval. Testing, commissioning, and documentation are required to the satisfaction of the LBNL Fire Marshal and Facilities Engineering.

Key dates

Questions due
Dec 10, 2026, 5:00 PM Pacific Time
Pre-bid meeting
Dec 3, 2026, 9:30 AM Pacific Time
Site visit
Dec 3, 2026, 9:30 AM Pacific Time
Bids due
Jan 8, 2027
Expected award
Feb 12, 2027

Documents

  • FACPR_RFP_2811.12.26_29.pdf21 pages
  • A_Statement_of_Work_for_Subcontract_7889840_2810.12.26_29.pdf24 pages
  • B_FACPR_RFP_Attachment_B_-_Factor_Resoponse_2811.12.26_29.pdf5 pages
  • C_FACPR_RFP_Attachment_C_-_Price_Proposal_2811.12.26_29.pdf4 pages
  • D_Subcontract_FACRP_2811.12.26_29.pdf25 pages
  • E_GPs_for_Fixed_Price_Design-Build_2810.9.26_29.pdf9 pages
  • F_Insurance_Certificate_Instructions_2810.09.26_29.pdf1 pages
  • G_Representations_and_Certifications_Form.pdf7 pages

1 more file

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby