Grading, Drainage, Bridges, Retaining Walls, Signals, ITS, and Paving on U.S. 78 (S.R. 4, Lamar Avenue) from Raines Road/Perkins Road Interchange to S.R. 176 (Getwell Road) in Memphis, Shelby County
Tennessee Department of Transportation — TDOT Construction DivisionTennessee#CN264077
78 (S.R. 4, Lamar Avenue) from the Raines Road/Perkins Road interchange to S.R. 176 (Getwell Road) in Memphis, Shelby County. The project is 1.850 miles long and must be completed by October 31, 2031. Prime and joint venture contractors must attend a mandatory pre-bid meeting on November 17, 2026, at 2:00 PM EST (1:00 PM CST) at the Region 4 Auditorium in Jackson, TN. Bids are due by 10:00 AM Central on December 4, 2026, via the Bid Express website. The Department will not execute contracts with corporations, LLCs, LPs, or LLPs not in good standing with the Secretary of State. Bidding authorization must be obtained by 4:00 PM Central the day before the letting. The bid must be accompanied by an electronic bid bond in an amount equal to at least 5% of the bid amount. The bid bond must be issued by a surety company qualified and authorized to transact business in Tennessee.
On PublicBidSearch: the original bid posting, 3 bid documents and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 4, 2026, 10:00 AM CT
- Time stated in bid documents
- Dec 4, 2026, 10:00 AM Central Time
- Bid bond
- 5%
- Submission
- internet
- Documents analyzed
- 3
- Required submission items
- 3 items · full checklist with Pro
Steps to Bid
- 1
1
Review the full bid package, including the Notice to Contractors, Instructions to Bidders, and the Notice of Mandatory Pre-Bid Meeting, available at [link available with Pro].
- 2
4
Attend the mandatory pre-bid meeting on November 17, 2026, at 2:00 PM EST (1:00 PM CST) at the Region 4 Auditorium, 300 Benchmark Place, Jackson, TN 38301. Attendance is mandatory for prime and joint venture contractors requesting authorization to bid.
What you'll need
Contract duration
On or before 10/31/2031
Submission
Internet
NAICS
237130, 237199, 237320, 237990
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 2 watch-outs that disqualify bidders
- The 3-item required-submittals checklist
Cancel anytime · no card to browse
Project details
Contract No. CN264077, Call No. 051 - Shelby County Project No. STP/NH-4(6), 79020-3253-14 (PIN 100340.00): The grading, drainage, bridges, retaining walls, signals, ITS, and paving on U.S. 78 (S.R. 4, Lamar Avenue) from the Raines Road/Perkins Road interchange to S.R. 176 (Getwell Road) in Memphis (L.M. 3.50-L.M. 5.34). Completion Time - On or before 10/31/2031 (See Special Provision 108B). Bids are received via the internet (Bid Express) until 10:00 A.M. Central on December 4, 2026.
Key dates
- Pre-bid meeting
- Nov 17, 2026, 2:00 PM Central Time
- Bids due
- Dec 4, 2026, 10:00 AM CT
Documents
- 20261204_NoticeToContractors.pdf14 pages
- 20261204_InstructionsToBidders.pdf4 pages
- Notice_of_Mandatory_Pre-Bid_Meeting_for_CN264077_Shelby.pdf1 pages
More from this agency
- Miscellaneous safety improvements and resurfacing on S.R. 89 from near Mill Street to near Oak Grove Road, Weakley… · closes Dec 4, 2026
- Microsurfacing on S.R. 58 from S.R. 68 to north of Ten Mile Road - Meigs County · closes Dec 4, 2026
- Drain Cleaning on Various State Routes in Davidson, Sumner, and Williamson Counties · closes Dec 4, 2026
- Resurfacing on S.R. 303 from U.S. 27 (S.R. 29) to S.R. 30 - Rhea County · closes Dec 4, 2026
- Traffic Signal Modernization Improvements on S.R. 49 (Main Street) and U.S. 79 (S.R. 76) Intersections — Houston and… · closes Dec 4, 2026
Similar bids in Tennessee
- Repair and Rehabilitation of a 370'-0” Three-Span Concrete Bridge (90-Degree Skew) on Sulphur Springs Road over West… · closes Dec 7, 2026
- Grading, Drainage, Signals, and Paving on U.S. 411 (S.R. 33) at Niles Ferry Road / Church Street Intersection, Monroe… · closes Dec 4, 2026
- Resurfacing on I-40 from Fletcher Creek to near Davies Plantation Road, including bridge expansion joint repair and… · closes Dec 4, 2026
- Resurfacing on I-24 from South of Wattendorf Memorial Highway to Near Prairie Plains Road, Coffee County · closes Dec 4, 2026
- Resurfacing on S.R. 20 from U.S. 412 (S.R. 99) to near Napier Road - Lewis County · closes Dec 4, 2026
Closing soon in Tennessee
- 46KV Sub Transmission Line Trimming and Right of Way Clearing — Invitation to Bid 16201 · closes Nov 30, 2026
- Glove Nitrile Large Flock Lined and Gloves Leather Driver Style Medium · closes Dec 1, 2026
- Cascade Tank Recoating and Repair Project · closes Dec 1, 2026
- New & Unused 2027 Model Fleet Replacement Vehicles for the Shelby County Sheriff's Office · closes Dec 2, 2026
- Construction of Wolf River Greenway – Phase Twelve B: Covington Pike to Summer Avenue · closes Dec 2, 2026