OpenIFBCloses Dec 8, 2026

Harbor Fleet Zero Emissions Infrastructure

Port of Long Beach — Program ManagementLong Beach, California#146674

The Port of Long Beach is soliciting bids for the construction of zero emissions charging infrastructure and associated electrical systems at multiple port facilities. The project is partially funded by a California Energy Commission grant (GFO-23-606). At least 30% of the work must be performed by the Contractor’s own employees. The project is subject to prevailing wage laws and requires a Project Labor Agreement. A mandatory pre-bid meeting and site visit are scheduled for October 20, 2026, at 9:00 a.m. at the Port of Long Beach Maintenance Facility. Bids must be submitted electronically via the Port of Long Beach PlanetBids system by 2:00 p.m. on November 17, 2026. A 10% bid bond is required. The contract term is 355 days to Substantial Completion and 445 days to Final Completion from the Notice to Proceed. The SBE/VSBE participation goal is 10% of the bid value.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 8, 2026
Bid bond
10%
Performance bond
100%
Payment bond
100%
Submission
electronic portal
Contract term
355 calendar days to Substantial Completion, 445 calendar days to Final Completion
Documents analyzed
1
Required submission items
6 items · full checklist with Pro

Steps to Bid

  1. 1

    Register on the Port of Long Beach PlanetBids (PB) System

  2. 2

    Download the Contract Documents from the PB System Vendor Portal

  3. 3

    Submit questions electronically via the PB System by November 10, 2026, at 5:00 p.m. was Nov 10, 2026, 5:00 PM

    This date has passed — confirm eligibility with the agency before bidding.

  4. 4

    Attend the mandatory pre-bid meeting and site visit on October 20, 2026, at 9:00 a.m. at the Port of Long Beach Maintenance Facility, 725 Harbor Plaza, Long Beach, CA 90802 was Oct 20, 2026, 9:00 AM

    This date has passed — confirm eligibility with the agency before bidding.

  5. 5

    Ensure all required documents are included: bid bond (10% of base bid), performance bond (100% of contract price), payment bond (100% of contract price), and signed contract

What you'll need

Contract duration

355 calendar days from Notice to Proceed

Submission

Electronic portal

NAICS

237130

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 6 watch-outs that disqualify bidders
  • The 6-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

The Work required by this Contract includes, but is not limited to, the construction of infrastructure and underground utilities and the installation of electrical equipment to support zero emissions charging equipment and charge management systems at various Port of Long Beach facilities. Refer to Section 01 11 00, Summary of Work, in the Technical Specifications. The project is subject to prevailing wage requirements under Labor Code Section 1720, with all workers paid at prevailing wage rates. A Project Labor Agreement (PLA) is required, binding the Contractor and all subcontractors. The Bidder must submit a Bidder’s Bond in the amount of 10% of the Base Bid. The Contractor must also provide a Performance Bond and Payment Bond, each for 100% of the Contract Price. The combined SBE/VSBE participation goal is 10% of the total bid value, with a minimum of 0% as VSBE.

Key dates

Pre-bid meeting
Oct 20, 2026, 9:00 AM Pacific Time
Site visit
Oct 20, 2026, 9:00 AM Pacific Time
Bids due
Dec 8, 2026

Documents

  • 20261005081935277_HD-S3203_Notice_Inviting_Bids-NIB.pdf7 pages

See all documents · Download with Pro

More from this agency

Similar bids near Long Beach

Closing soon near Long Beach