HD-S3215 Pier B On-Dock Rail Support Facility Rail Yard Access Improvements
Port of Long Beach — Program ManagementLong Beach, Los Angeles, California#147471
The Port of Long Beach is soliciting bids for the Pier B On-Dock Rail Support Facility Rail Yard Access Improvements in Long Beach, CA. The work includes realignment and construction of new lead tracks in the Pier B rail yard and Pico Avenue corridor, signal system modification at CP Gaspur, demolition of existing tracks and utilities, earthwork, storm drain improvements, utility protection, relocation of street lighting, fencing, and traffic control. The project must be completed within 457 days of Notice to Proceed. Bidders must hold a valid Class A California Contractor’s License at the time of award. The project is subject to prevailing wage laws and requires registration with the Department of Industrial Relations. A Project Labor Agreement (PLA) is mandatory. The SBE/VSBE participation goal is 30% of the total bid value. Bidders must attend a mandatory pre-bid meeting and site visit on November 16, 2026, at 1:30 p.m. at the Port of Long Beach Maintenance Facility. Bids must be submitted electronically via the PB System by 2:00 p.m. on December 15, 2026. A bid bond of 10% of the base bid is required. Questions must be submitted electronically by December 8, 2026, at 5:00 p.m.
On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.
Contact
Agency contact for this bidName, email and phone — included with ProProOverview
- Due
- Dec 15, 2026
- Time stated in bid documents
- Dec 15, 2026, 2:00 PM Pacific Time
- Bid bond
- 10%
- Performance bond
- 100%
- Payment bond
- 100%
- Submission
- electronic portal
- Contract term
- 457 calendar days from Notice to Proceed
- Documents analyzed
- 1
- Required submission items
- 6 items · full checklist with Pro
Scope of work
- Demolition and removal of existing tracks, pavement, utilities, and structures
- Earthwork, grading, subgrade preparation, and soil disposal
- Utility protection including casing extension for water line and LACSD trunk sewer
Steps to Bid
- 1
Register on the Port of Long Beach PB System Vendor Portal at Official linkPro
- 2
Download the Contract Documents from the PB System by Before submitting the bid
- 3
Submit all questions electronically via the PB System by December 8, 2026, at 5:00 p.m. by Dec 8, 2026, 5:00 PM
- 4
Attend the mandatory pre-bid meeting and site visit on November 16, 2026, at 1:30 p.m. at the Port of Long Beach Maintenance Facility, 725 Harbor Plaza, Long Beach, CA 90802 was Nov 16, 2026, 1:30 PM
This date has passed — confirm eligibility with the agency before bidding.
- 5
Prepare and submit the bid electronically via the PB System by 2:00 p.m. on December 15, 2026 by Dec 15, 2026, 2:00 PM
What you'll need
Insurance
RequiredThe Contractor receiving award of the Contract and Subcontractors of any tier shall pay not less than the prevailing wage rates to all workers employed in execution of the Contract. The Department of Industrial Relations of the State of California has determined the general prevailing rates of wages in the locality in which the Work is to be performed. The rate schedules are available on the internet at [link available with Pro] and on file at the City, available upon request. Bidders are directed to Article 15 of the General Conditions for requirements concerning payment of prevailing wages, payroll records, hours of work and employment of apprentices.
Contract duration
457 calendar days from Notice to Proceed
Submission
Electronic portal
NAICS
236115
How to submit
Bids must be submitted electronically via the Port of Long Beach PB System. Bidders must register on the PB System to access the documents and submit the bid. The bid must include the signed contract, bid bond, insurance forms, payment bond, and performance bond. All documents must be submitted within 30 calendar days of conditional award.
Pursuit snapshot
Pro- Go / no-go verdict on every requirement
- 9 watch-outs that disqualify bidders
- The 6-item required-submittals checklist
Cancel anytime · no card to browse
Project details
The Work required by this Contract includes, but is not limited to, the realignment, relocation, shifting, resurfacing, and rehabilitation of existing railroad tracks and construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor, including special trackwork (turnouts and a crossover); modification of the railroad signal system at CP Gaspur; demolition and removal of existing tracks, pavement, utilities, and structures, including removal of abandoned third-party utilities; earthwork, grading, subgrade preparation, and soil disposal; storm drain and underdrain improvements; utility protection, including a casing extension for water line protection and protection of the LACSD trunk sewer; relocation of street lighting; fencing; and traffic control, with the Work phased around active railroad operations. Refer to Section 01 11 00, Summary of Work in the Technical Specifications. The Contractor shall achieve Substantial Completion within 457 calendar days and Affidavit of Final Completion within 547 calendar days from a Notice to Proceed. The Bid must be accompanied by a Bidder’s Bond in an amount not less than 10% of the Base Bid. The project is subject to prevailing wage requirements under Labor Code Section 1720 and requires registration with the Department of Industrial Relations. The project is partially funded by U.S. DOT MARAD 2021 Port Infrastructure Development Program (Grant #693JF722450027). Attendance is mandatory for all bidders. Failure to attend disqualifies the bid. Bidders must register on the Port of Long Beach PB System to access contract documents.
Key dates
- Pre-bid meeting
- Nov 16, 2026, 1:30 PM Pacific Time
- Site visit
- Nov 16, 2026, 1:30 PM Pacific Time
- Bids due
- Dec 15, 2026
Documents
- 20261019161350917_HD-S3215_Notice_Inviting_Bids-NIB.pdf7 pages
More from this agency
- On-Call Professional Clean Energy and Operational Resiliency Services · closes Dec 3, 2026
- Harbor Fleet Zero Emissions Infrastructure · closes Dec 8, 2026
- HD-S3262 On-Call Services for Underground Wet Utilities · closes Dec 15, 2026
- On-Call Fiber-Optic Network (FON) Enhancements and Repairs · closes Dec 16, 2026
- HD-S3254 Port-Wide Waterborne Equipment Rental and Services · closes Jan 5, 2027
Similar bids near Long Beach
- Naples Seawall – Vista Del Golfo Tiebacks REBID · Long Beach · closes Jan 13, 2027
- HD-S3180 Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening · Long Beach · closes Dec 15, 2026
- Pre-Development Agreement for Marine Container Terminal at Pier 500 · Los Angeles · closes Jan 6, 2027
- Pre-Development Agreement Marine Container Terminal Pier 500 · Los Angeles · closes Dec 11, 2026
Closing soon near Long Beach
- Request for Information: CSU Preferred Lenders · Long Beach · closes Nov 30, 2026
- OnCall Professional Clean Energy and Operational Resiliency Services · Long Beach · closes Dec 3, 2026
- Fleet Services EV Charging Depot – Installation of 5 Dual-Port DC Fast Chargers and Battery Energy Storage System · Long Beach · closes Dec 4, 2026
- OCADY's Training Prop Repair and Maintenance · Long Beach · closes Dec 4, 2026
- Preventative Maintenance, Inspection, and Repair Services for Government-Owned Fume Hoods and Safety Cabinets · Long Beach · closes Dec 4, 2026