OpenConstructionCloses Dec 4, 2026, 4:00 AM CT

Houston County — Roadway Improvements (Widening, Resurfacing, Turn Lane Installation, Crossover Removal, and Traffic Stripe) on SR-210 (US-231/Ross Clark Circle) from Fortner Street to SR-52, Dothan, Alabama

Alabama Department of Transportation — ALDOTAlabama#NH-0210(512)

Scope includes widening, resurfacing, turn lane installation, crossover removal, traffic stripe application, concrete island removal, and traffic signal modifications. Work spans 0.838 miles. Key items include excavation, borrow material, aggregate base, micro-milling, Superpave asphalt layers, storm sewer and roadway pipe installation, concrete curb and guardrail, erosion control, and temporary and permanent traffic control. The project duration is 115 working days. The bracket estimate is $3,243,387 to $3,964,140.

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (name, email and phone) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidName, email and phone — included with ProPro

Overview

Due
Dec 4, 2026, 4:00 AM CT
Time stated in bid documents
Dec 4, 2026, 4:00 AM Central Time
Submission
mail, hand delivery
Contract term
115 working days
Documents analyzed
1
Required submission items
2 items · full checklist with Pro

Scope of work

  • Widen SR-210 from Fortner Street to SR-52 by 0.838 miles
  • Resurface with Superpave asphalt layers (3,800 ton, 1,080 ton)
  • Install turn lanes and remove crossovers
  • Remove concrete islands and modify traffic signals at SR-52 and Fortner Street
  • Install storm sewer pipes (24”, 18”, 60”) and roadway pipes (60”)
  • Construct concrete curb, guardrail, and erosion control measures

Steps to Bid

  1. 1

    Register with ALDOT's e-procurement portal and obtain access to the solicitation documents.

  2. 2

    Review the full bid package, including plans, specifications, and the bid schedule (PITEMS018.pdf).

  3. 3

    Submit a written bid proposal by the due date and time. by Dec 4, 2026, 4:00 AM

  4. 4

    Pay the $5.00 bid proposal fee and $41.00 per set for plans. by Dec 4, 2026, 4:00 AM

What you'll need

Contract duration

115 working days

Submission

Mail, Hand delivery

NAICS

237130

How to submit

Submit one original and one electronic copy on USB drive inside a sealed envelope. The envelope must be marked with the bid number and due date.

In person/mail: Alabama Department of Transportation, Procurement Office, 5000 County Line Road, Montgomery, AL 36117

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 1 watch-out that disqualifies bidders
  • The 2-item required-submittals checklist
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Key items include: clearing and grubbing (approx. 2 acres), removal of concrete slope paving (775 sq yd), concrete flumes (42 sq yd), driveways (172 sq yd), pipe (375 lf), curb (657 lf), headwalls (10 each), and excavation (4,265 cu yd). Borrow excavation (2,775 cu yd), roadbed processing (31 rbst), and crushed aggregate base (12,225 sq yd) are included. Bituminous treatments: tack coat (4,740 gal), micro-milling (46,057 sq yd), and Superpave wearing surface layers (3,800 ton, 1,080 ton). Storm sewer pipes (24” and 18” Class 3 R.C., 29 lf each), 60” roadway pipe (29 lf), and 22” span storm sewer pipe (8 lf) are installed. Concrete curb (287 lf), combination curb and gutter (253 lf), guardrail (338 lf), and end anchors (2 each). Erosion control: geotextile (1,343 sq yd), mulching (2 acre), seeding (2 acre), sodding (6,425 sq yd), and silt fence (2,510 lf). Temporary traffic control: temporary stripes (10 miles), temporary signs (1,272 sq ft), cones (120), barricades (38), and portable signs (2 each). Traffic signal modifications: removal and installation of traffic control units at Fortner Street and SR-52, including temporary units (6 each), radar detection systems (1 each), signal heads (34), controllers (2), and electrical conduits (236 lf). Final traffic markings: solid white (3 miles), solid yellow (2 miles), broken white (2 miles), and contrast border stripes (360 lf).

Key dates

Questions due
Nov 20, 2026, 4:00 PM Central Time
Bids due
Dec 4, 2026, 4:00 AM CT

Documents

  • PITEMS018.pdf3 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby