ClosedRFQClosed Nov 19, 2026, 12:00 PM CT

IL 50 at Cal Sag Channel, Phase I Project, Cook County

Illinois Department of Transportation — IDOT Bureau of Design and Environment - Consultant ServicesIllinois#P-91-028-24

The Illinois Department of Transportation (IDOT) is seeking Statements of Interest for Phase I engineering services for the IL 50 at Cal Sag Channel project in Cook County. The project involves preliminary engineering and environmental studies for bridge rehabilitation or reconstruction, with potential for additional structures to be added. The estimated construction cost is $30,000,000. The contract will use the Cost Plus Fixed Fee (CPFF) method. A DBE goal of 17% is required. The contract duration is 60 months after authorization to proceed. Firms must be prequalified in Special Studies (Location Drainage) and Structures (Highway: Typical). Statements of Interest are due by 12:00 PM on November 19, 2026, and must be submitted through the Engineering Prequalification and Agreement System (EPAS).

On PublicBidSearch: the original bid posting, 1 bid document and the agency contact (email) for this bid.

Open Original Bid Source Pro

Contact

Agency contact for this bidEmail — included with ProPro

Overview

Due
Nov 19, 2026, 12:00 PM CT
Time stated in bid documents
Nov 19, 2026, 12:00 PM Central Time
Submission
electronic portal
Contract term
60 months after authorization to proceed
Documents analyzed
1

Scope of work

  • Studies anticipated to result in a Categorical Exclusion.
  • Rehabilitation or reconstruction of several bridges.
  • Work associated with the preparation of preliminary engineering and environmental studies.

Steps to Bid

  1. 1

    Submit Statement of Interest (SOI) through the Engineering Prequalification and Agreement System (EPAS). by Nov 19, 2026, 12:00 PM

    Statements of interest must be RECEIVED by 12:00 PM NOON on November 19, 2026. Statements received after 12:00 PM WILL NOT be considered. Only SUBMITTALS through EPAS will be considered.

What you'll need

Prequalification

Required

Contract duration

60 months after authorization to proceed

Submission

Electronic portal

How to submit

All interested firms must submit through the Engineering Prequalification and Agreement System (EPAS).

Pursuit snapshot

Pro
  • Go / no-go verdict on every requirement
  • 10 watch-outs that disqualify bidders
Unlock with Pro — $20/mo

Cancel anytime · no card to browse

Project details

Other structures might be added to the project scope as the contract progresses based on the department’s needs. The completion time is 60 months after authorization to proceed. The bulletin was published October 29, 2026, and revised November 10, 2026.

Key dates

Bids due
Nov 19, 2026, 12:00 PM CT
Expected award
Jan 13, 2027

Documents

  • ptb-222r.pdf170 pages

See all documents · Download with Pro

More from this agency

Similar open bids

Closing this week nearby